Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2005 | PLUMBING - FINAL | Partial Approval | OK FOR TEMP C OF O PER INSP REMARKS | |
| 09/09/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) (2) BACKFLOW CERTIFICATIONS TURNED IN 2) BACTERIA REPORT TURNED IN |
|
| 09/08/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) ITEMS 1 AND 3 TO BE FINISHED |
|
| 09/02/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE 90 DEGREE TERMINATION ON WATER HEATER. T & P DRAIN PIPE 2) SECURE WATER HEATER EXPANSION TANK 3) PROVIDE DOMES AND OVERFLOW DAMS FOR ROOF DRAINS 4) PROVIDE BRASS NIPPLE FOR ROOF TOP HOSE BIB WITH INSULATION TO FOLLOW OR PROVIDE FREEZE PROOF HOSE BIB IF THAT IS WHAT AY24 IS PER PLAN |