Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 8150 S HOUGHTON RD
Search
Parcel Attributes
Parcel | 141153560 11415008U 14115008U |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-2 |
Water Course | Washes |
Tucson Ward | Ward 4 |
Tucson Registered Neighborhood | Rita Ranch |
Major Streets & Routes | Scenic Route ,Intersection Buffer |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Historic Records Requests
Address: 8150 S HOUGHTON RD
Date - 11/08/2024 7:39 p.m.
Total Number Of Historic Records Requests - (3)
Name | Action |
---|---|
Address: 8150 S HOUGHTON RD - Doc Type: CERT OF OCC | |
Address: 8150 S HOUGHTON RD - Doc Type: CERT OF OCC | |
Address: 8150 S HOUGHTON RD - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 8150 S HOUGHTON RD
Date - 11/08/2024 7:39 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 8150 S HOUGHTON RD
Date - 11/08/2024 7:39 p.m.
Total Number Of Permits - (16)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-0524-00986 | Issued | 05/22/2024 | 05/05/2025 | Commercial Building | Replacement of (Like for Like) HVAC package heat pumps for the building | |
DP16-0082 | Complete | 05/12/2016 | 12/25/2016 | Development Package | SITE - ADA COMPLIANCE | |
T04AN00707 | ISSUED | 07/22/2004 | N/A | ADDRNEW | ||
T04CM03394 | C OF O | 07/22/2004 | 08/14/2006 | COMBO | BANK:NEW | |
T05BU01363 | FINAL | 05/31/2005 | 02/28/2006 | SPKLR | SPRINKLER:FIRE NEW & U/G PIPE | |
T05OT00212 | WITHDRWN | 01/31/2005 | 07/31/2005 | SIGN | SIGN:8423 BANK OF AMERICA | |
T05OT02017 | EXPIRED | 08/15/2005 | 02/13/2006 | SIGN | SIGN: 9521 BANK OF AMERICA | |
T18RW00630 | FINAL | 02/05/2018 | 04/13/2018 | ROW | (2) 5x5 IN DIRT SHOULDER ON EAST SIDE OF HOUGHTON RD TO REPAIR/REPLACE GAS LINE | |
T19RW01830 | FINAL | 04/05/2019 | 06/08/2019 | ROW | ACCESSING HH #41545 TO PLACE NEW FIBER | |
T19RW06405 | FINAL | 10/23/2019 | 12/22/2018 | ROW | Starting on the N. side of E. Rita Rd E of S. Houghton Rd trench / bore West 325' N/W 70' W. 130' placing a 3x3x3 pothole for new Cox Vault continue Trench/ bore N. 270' Continuing trench/bore from out of row on the N. side of E. Rita Rd West of S. Houghton Rd going 80' continuing S. 115' to Out of row transferring cable from old TEP poles to New TEP poles from the West side of S. Houghton Rd going South for 600'. OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION. | |
T19RW07509 | FINAL | 12/12/2019 | 03/22/2020 | ROW | N.548452 - COT PROJECT NUMBER SR1H. COT PLAN NO.1-2017-013 - 4,415' OF AERIAL CABLE, STRAND AND INNERDUCT. 3 - POLE ANCHORS, 3 - DOWN GUYS, 4 - BURIED CABLE CLOSURES, 5 - LOCATIONS FOR MANHOLE / HANDHOLE ACCESS. | |
T19RW07809 | FINAL | 12/31/2019 | 02/06/2019 | ROW | Trimp indirect survey work at various locations on Houghton Rd Please note crews may work during the day or night depending on traffic conditions ADDRESS CHANGED FROM : "Various Locations on Houghton Rd" to: "8150 S HOUGHTON RD" (3 OF 4) NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. | |
T20CM04377 | FINAL | 07/13/2020 | 05/12/2021 | COMBO | ADD 2 NEW BLDG LIGHT FIXTURES, INSTALL 1 NEW POLE BASE STRUCTURE WITH NEW POLES AND FIXTURE HEADS. REPL 32 EXISTING LIGHT FIXTURES. | |
T20RW00785 | FINAL | 02/07/2020 | 01/15/2021 | ROW | Starting on the N. side of E. Rita Rd, East of S. Houghton Rd trench / bore West 325' N/W 70', West 130' placing a 3x3x3 pothole for new Cox Vault. Continue Trench/ bore West 620' Tie in to Existing conduit. Continuing work in front of 10200 E RITA RD at cox PED, trench / bore North 280' placing new cox PED. Continuing work in front of 8260 S. Houghton Rd, trench /bore N. 588', Placing Potholes where needed. NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. | |
T20RW05161 | FINAL | 09/22/2020 | 10/24/2020 | ROW | Starting on the West side of S. Houghton Rd South of E. Rita Rd at TEP pole Cox Communications to remove existing abandoned aerial going north for 622' Old existing permit # T19RW06405 - CIP project SR1H WATTS RL-1217 | |
T20RW05802 | FINAL | 10/22/2020 | 11/22/2020 | ROW | STARTING ON THE WEST SIDE OF S HOUGHTON RD SOUTH OF E RITA RD AT THE TEP POLE, COX COMMUNICATIONS TO REMOVE EXISTING ABANDONED AERIAL GOING NORTH FOR 622 LF. CONTINUATION FROM PREVIOUS PERMIT T19RW06405 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION. |