Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM03394
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2005 | ENGINEERING - FINAL | Approved | ||
09/08/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED AT THIS TIME FINAL NOT TO BE GIVEN UNTIL ALL EXTERIOR WORK FOR THIS SITE IS COMPLETE. GENERAL CLEAN-UP OF THE SITE IS REQUIRED PRIOR TO REQUESTING ADDITIONAL INSPECTIONS. ALL DUMPSTERS NEED TO BE RELOCATED TO AREAS OUTSIDE OF THE P.A.A.L.'S FOR THIS SITE. TRUNCATED DOMES ARE CURRENTLY REQUIRED AT ALL WHEELCHAIR ACCESS RAMPS, AND MAYBE REQUIRED IN THE FUTURE IF ANY ADDITIONAL WORK IS DONE TO THIS SITE. |