Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T04CM01885
Permit Details
Apply Date:
04/27/2004
Applicant:
N/A
Description:
NEW CHURCH
Contractors:
- SILVER WEST INC ,
Permit Reviews
Permit Number - T04CM01885
Permit Status: C of o
Permit Description: NEW CHURCH
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/13/2005 | RESUBMITTAL | 02/04/2005 | COMPLETED |
04/27/2004 | PLANS OK TO SUBMIT - 3RD PARTY | 05/04/2004 | COMPLETED |
05/04/2004 | 3RD PARTY REVIEW-COMMERCIAL | 10/13/2004 | COMPLETED |
10/13/2004 | COMMERCIAL NEW | 11/29/2004 | COMPLETED |
12/03/2004 | RESUBMITTAL | 12/27/2004 | COMPLETED |
12/29/2004 | RESUBMITTAL | 01/12/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM01885
Permit Status: C of o
Permit Description: NEW CHURCH
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/27/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T04CM01885
Permit Description: NEW CHURCH
Total Completed Inspections - 45
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/24/2005 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :* 1) AIR PRESSURE TEST IS OK. 2) THIS INSPECTION IS FOR UNDERGROUND WASTE AND IS OK UP TO WATER CLOSETS IN MAIN RESTROOM @ EAST END OF BUILDING. 3) OK TO BACKFILL TRENCH. |
02/24/2005 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :* 1) AIR PRESSURE TEST IS OK. 2) ALL CORRECTIONS HAVE BEEN MADE. 3) OK TO BACKFILL TRENCH. |
03/04/2005 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | IVRS - Inspection :* |
03/07/2005 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
03/29/2005 | BUILDING PRE-SLAB | AMATHIES | Approved | IVRS - Inspection :* |
03/29/2005 | EXCAVATION/LAYOUT REBAR & ZON | AMATHIES | Approved | IVRS - Inspection :* |
07/18/2005 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* 1) OK SECONDARY CONDUITS FROM X-FORMER TO SES AT BLDG |
09/02/2005 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | IVRS - Inspection :* |
09/16/2005 | ELECTRIC - INTERMEDIATE | RMAJUTA | Approved | IVRS - Inspection :* ASSEMBLY AREA OK TO COVER WALLS |
09/30/2005 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection :* |
09/30/2005 | ROOF NAILING | AMATHIES | Approved | IVRS - Inspection :* |
09/30/2005 | EXT METAL CLIPS/EXT SHEATHING | AMATHIES | Approved | IVRS - Inspection :* |
12/09/2005 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR CEILING TILES ALL AREAS EAST OF SANCTUARY 2) PLANS REQUIRE COPPER ON ALL CONDENSATE PIPING 3) FAN COILS WILL NEED SECONDARY DRAINS |
12/09/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
12/09/2005 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* PROVIDE HANGERS AT CHANGE OF DIRECTION |
12/09/2005 | BUILDING ABOVE CEILING | AMATHIES | Approved | IVRS - Inspection :* |
12/09/2005 | PLUMBING - BACK WATER VALVE | BBENEDON | Approved | IVRS - Inspection :* |
12/14/2005 | PLUMBING - ABOVE CEILING | BBENEDON | Approved | IVRS - Inspection :* 1) GAS LINE 2) 14.6 PSI 3) GAS LINE PIPING WITHIN BLDG OK TO COVER 4) PRESSURE TEST APPEARS TO BE HOLDING 5) RAISE DRIP LEGS ABOVE ROOF 6) RE-PRESSURE TEST 7) SUPPORT PIPING 8) SEAL PENETRATION 9) CHECK BTU RATING ON FLEX CONNECTORS TO ROOF TOP FURNACES |
12/14/2005 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* OK EAST OF SANCTUARY |
12/14/2005 | SITE - SEWER | BBENEDON | Approved | IVRS - Inspection :* |
12/14/2005 | FRAMING | AMATHIES | Approved | IVRS - Inspection :* |
12/22/2005 | U VALUE FOR WINDOW | AMATHIES | Approved | IVRS - Inspection :* |
03/01/2006 | PLUMBING - GAS PRESSURE TEST | BBENEDON | Approved | IVRS - Inspection :* 14.7 PSI 1055 BOND REQUIRED FOR UTILITY CLEARANCE CLOSET FLANGES OK |
03/01/2006 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* |
03/14/2006 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | IVRS - Inspection :* |
03/14/2006 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* |
03/15/2006 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER D. SANTACRUZ |
03/24/2006 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* |
03/24/2006 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* |
03/24/2006 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
03/24/2006 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
03/24/2006 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
03/27/2006 | SIGN - FINAL | RDEAR | Approved | |
03/27/2006 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
03/27/2006 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
03/27/2006 | FIRE - FINAL | LTHOMAS | Approved | |
03/28/2006 | MECHANICAL - PROGRESS | CWILLIAM | Approved | IVRS - Inspection :* |
03/29/2006 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
03/30/2006 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
03/30/2006 | NPPO - FINAL | ACONNOR | Approved | |
03/30/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
04/06/2006 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
06/20/2006 | ENGINEERING - FINAL | MAVERY | Approved | Contractor completed punch list. |
06/21/2006 | STEM WALL/RETAINING WALL | LHANLY | Approved | |
06/21/2006 | PERMIT FINALED | DROBEY | Approved |