Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM01885
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
05/05/2006 | ENGINEERING - FINAL | Not ready for Inspection | Not ready for full C of O. Contractor addressed items 2, 3, 4, and 7 from punch list. Contractor still needs to address items 1, 5, 6, and 8 and complete punch list from grading permit. | |
03/30/2006 | ENGINEERING - FINAL | Partial Approval | Only good of 90 days. OK for temp C of O. Contractor needs to address: 1- Complete all basin work. 2- Install tow down on basin inlet. 3- Separate construction activity for public activity. 4- Install bollards and gates on trash enclosure. 5- Provide letter from engineer in regards to basin and drainage ways. 6- Stabilize area around perimeter of project. 7- Install scupper and curb cut on west side of building. 8- See punch list for grading permit. |