Permit: T04BU02986
Permit Details
Apply Date:
12/15/2004
Applicant:
THE W L B GROUP - LINDA THOMPSON
Description:
GRADING: Menlo Park Grading Plan RIO NUEVO MERCADO DIST.
Contractors:
- GRANITE CONSTRUCTION COMPANY
Permit Reviews
Permit Number - T04BU02986
Permit Status: Expired
Permit Description: GRADING: Menlo Park Grading Plan RIO NUEVO MERCADO DIST.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2005 | RESUBMITTAL - GRADING ALL | 03/31/2005 | COMPLETED |
05/03/2005 | RESUBMITTAL - GRADING ALL | 05/16/2005 | COMPLETED |
12/15/2004 | PLANS OK TO SUBMIT - GRADING | 12/15/2004 | COMPLETED |
12/16/2004 | GRADING | 01/25/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02986
Permit Status: Expired
Permit Description: GRADING: Menlo Park Grading Plan RIO NUEVO MERCADO DIST.
Total Outstanding Activity Conditions - 8
Date | Name |
---|---|
12/15/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
05/10/2005 | LANDSCAPE INSPECTOR MUST CHECK FENCING OF NATURAL AREAS PRIOR TO GRUBBING OR GRADING. |
05/10/2005 | SWPPP SHALL BE UPDATED AT SITE AS INSPECTIONS AND GRADING PHASING WARRANT UPDATES. CALCULATIONS FOR TEMPORARY 2-FT BERM ALONG SOUTH GRADING LIMITS REQUIRED TO BE SUBMITTED. |
05/10/2005 | NO DISTURBANCE ALLOWED OUTSIDE OF GRADING LIMITS. |
05/10/2005 | NO EXCAVATION IS PERMITTED AT THIS TIME OUTSIDE OF GRADING LIMITS. |
05/10/2005 | RIGHT OF ENTRY AND GRADING PLANS AND GRADING PERMIT AND SWPP ARE REQUIRED ON SITE AT ALL TIMES. |
05/10/2005 | CALL DSD FOR GRADING PRE-CON AND SWPP CONTROL INSPECTION. |
05/10/2005 | OFFSITE PERMIT REQUIRED FOR WORK BEYOND GRADING LIMITS AS SHOWN ON THESE APPROVED PLANS. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T04BU02986
Permite Description: GRADING: Menlo Park Grading Plan RIO NUEVO MERCADO DIST.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
STORMWATER FINAL INSPECTION | N/A | Not Inspected | ||
LANDSCAPE INSPECTION | N/A | Not Inspected | ||
04/22/2020 | GRADING - CHECK FOR ACTIVITY | N/A | Correction Required | NO INSPECTIONS HAVE BEEN SCHEDULED FOR THIS SITE SINCE IT WAS LAST INSPECTED IN 2017. THERE HAVE BEEN CHANGES MADE TO THIS SITE THAT ARE NOT REFLECTED ON THIS SET OF APPROVED PLANS. THIS SITE WILL NEED TO BE PLACED BACK INTO ISSUED STATUS, REVISED DRAWINGS NEED TO BE PROVIDED FOR ALL CHANGES THAT HAVE BEEN MADE, AND THEN THE SIGHT NEEDS TO SCHEDULED FOR A NEW INSPECTION WITH THE REVISED DRAWINGS. |
12/06/2012 | INVESTIGATIVE INSPECTION | N/A | Continued | CHECKING FOR DAVE LOTS THAT HAVE BEEN BUILT ON. |
12/11/2007 | GRADING - FINAL | N/A | Correction Required | Contractor needs to call in final inspection. No activity today. (rain) |
12/29/2006 | STORMWATER FOLLOW-UP INSP | N/A | Correction Required | Contractor needs to: 1- Sweep all streets. 2- Clean track out on to W. Congress St. 3- Provide wash out area for all subs and ensure sub-contractor use. 4- Re-install existing controls around perimeter of project. 5- Install temp controls around building lots. Will met with Rick on 1/4/07 at 0900 hours, in regards to SWPPP issues. |
Completed Inspections
Permit Status: Expired
Permit Number: T04BU02986
Permit Description: GRADING: Menlo Park Grading Plan RIO NUEVO MERCADO DIST.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/19/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
06/09/2005 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | THE CONTRACTOR WORKED ON REMOVAL OF TREES DURING THE PAST 2 WEEKS AND IS STARTING THE INSTALLATION OF STORMWATER CONTROLS THIS MORNING. THE PRE-CON CHECK LIST WAS DISCUSSED AND SIGNED BY ALL PARTIES. |
06/10/2005 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | THE INSTALLATION OF THE STORMWATER CONTROLS WAS COMPLETED BY 6/10/05 AND WILL BE MONITORED OVER THE DURATION OF THE CONTRACT. |