Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/09/2005 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
THE CONTRACTOR WORKED ON REMOVAL OF TREES DURING THE PAST 2 WEEKS AND IS STARTING THE INSTALLATION OF STORMWATER CONTROLS THIS MORNING. THE PRE-CON CHECK LIST WAS DISCUSSED AND SIGNED BY ALL PARTIES. |
| 05/19/2005 |
ENGINEERING PRE-CONSTRUCTION |
|
Denied |
MET WITH THE DEVELOPER TO DISCUSS THE WORK THAT IS TO TAKE PLACE ON THIS SITE. WORK WILL NOT BE STARTED HERE UNTIL AFTER THE 1ST OF JUNE. I WILL RE-INSPECT THE SITE ONCE WORK HAS BEEN STARTED. |