Permit: T04BU02156
Permit Details
Apply Date:
08/31/2004
Applicant:
STEVE WHILLIER
Description:
GRADING:0 CUT 490 FILL
Contractors:
- ASHTON COMPANY INC CONTRACTORS *T
Permit Reviews
Permit Number - T04BU02156
Permit Status: Final
Permit Description: GRADING:0 CUT 490 FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2005 | RESUBMITTAL - GRADING | 03/16/2005 | COMPLETED |
| 03/16/2005 | RESUBMITTAL - GRADING | 05/15/2006 | COMPLETED |
| 08/31/2004 | GRADING | 08/31/2004 | COMPLETED |
| 08/31/2004 | GRADING | 12/07/2004 | COMPLETED |
| 09/11/2007 | REVISION - GRADING | 09/11/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02156
Permit Status: Final
Permit Description: GRADING:0 CUT 490 FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/31/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02156
Permit Description: GRADING:0 CUT 490 FILL
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2006 | GRADING - FINAL | MAVERY | Approved | Contractor needs to: 1- Stabilize all areas disturbed by construction. 2- Remove all SWPPP controls after site is stabilized. 3- Provide letter from engineer in regards to drainage. Per chapter XIV, section 14.2 (7) 4- Backfill all open holes. 5- Install driveway per approved plans. 6- Submit asbuilt drawing to city engineer for approval. (Elev. not matching approved drawings) |
| 09/17/2007 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | |
| 09/17/2007 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | |
| 09/17/2007 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | |
| 09/21/2007 | PERMIT FINALED | KMEDINA | Approved |