Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2007 | GRADING - FINAL | Approved | Contractor provided asbuilt and letter from engineer. | |
| 03/27/2007 | GRADING - FINAL | Denied | Contractor completed items 4 and 5 on 10/31 punch list, needs to complete the remaining items. Need to check on the new chain link fence that was placed in front of an exisitng box culvert under the Nogalis Hwy. It will block the flow of stormwater. |
|
| 10/31/2006 | GRADING - FINAL | Denied | Contractor needs to: 1- Stabilize all areas disturbed by construction. 2- Remove all SWPPP controls after site is stabilized. 3- Provide letter from engineer in regards to drainage. Per chapter XIV, section 14.2 (7) 4- Backfill all open holes. 5- Install driveway per approved plans. 6- Submit asbuilt drawing to city engineer for approval. (Elev. not matching approved drawings) |
|
| 08/24/2006 | GRADING - FINAL | Correction Required | Issued Correction Notice. Contractor needs to: 1. Install SWPPP controls per detail. 2. Post NOI. Contractor can not provide an approved copy of grading or SWPPP drawings. |
|
| 06/26/2006 | GRADING - FINAL | Denied | Contractor needs to schedule pre-con meeting and supply approved drawings for SWPPP inspection and grading. |