Permit: T03BU00974
Permit Details
Apply Date:
04/21/2003
Applicant:
LANDMARK ENGINEERING
Description:
GRADING:118557CY CUT & 118332CY FILL
Contractors:
- N A C CONSTRUCTION ,
Permit Reviews
Permit Number - T03BU00974
Permit Status: Final
Permit Description: GRADING:118557CY CUT & 118332CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2003 | PLANS OK TO SUBMIT - GRADING | 04/21/2003 | COMPLETED |
| 04/21/2003 | GRADING | 04/25/2003 | COMPLETED |
| 04/28/2003 | RESUBMITTAL | 05/16/2003 | COMPLETED |
| 05/21/2009 | REVISION - GRADING | 06/17/2009 | COMPLETED |
| 11/04/2009 | REVISION - GRADING | 04/11/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03BU00974
Permit Status: Final
Permit Description: GRADING:118557CY CUT & 118332CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/21/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T03BU00974
Permit Description: GRADING:118557CY CUT & 118332CY FILL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2003 | NPPO PRE PERMIT INSPECTION | PGILBERT | Approved | |
| 12/28/2004 | STORMWATER FOLLOW-UP INSP | JSALINE | Approved | CONTACT WAS MADE WITH GRANITE CONSTRUCTION SUPER ANDY WASH (237-0873). REQUEST WAS GIVEN TO PROVIDE ADDITIONAL STORM WATER CONTROL VIA "V" DITCH ALONG THE N AND NW PARIMETERS. ANDY EXPLAINED HE WOULD HAVE THIS DONE THIS WEEK. RE-INSPECTION IS SCHEDULED FOR TUESDAY THE 4TH. |
| 10/07/2008 | GRADING - FINAL | NKALAHAR | Approved | FINAL GRADING CALLED IN NO INSPECTION AS REQUIRED DRAWINGS HAVE NOT BEEN SUBMITTED |
| 08/20/2009 | GRADING - TIER REV | ELEIBOLD | Approved | Need conditions of permit met for final approval. Including geotech post trench construction drain down confirmation (24). Left message with Sam at KB and discussed with Arden (EOR). |
| 11/25/2009 | ENGINEERING PRE-CONSTRUCTION | JFEMLING | Approved | |
| 11/25/2009 | STORMWATER INSTALL OF CONTROLS | JFEMLING | Approved | |
| 11/25/2009 | GRADING - INTERMEDIATE | JFEMLING | Approved | Checked CB gravel bags have not been removed. |
| 01/07/2010 | STORMWATER FINAL INSPECTION | JFEMLING | Approved | Site stabilized. |