Permit: T02CM04588
Permit Details
Apply Date:
10/01/2002
Applicant:
TUCSON WATER
Description:
INSTALL:RESERVOIR & BOOSTER STATION
Contractors:
- ASHTON COMPANY INC CONTRACTORS *C
Permit Reviews
Permit Number - T02CM04588
Permit Status: Expired
Permit Description: INSTALL:RESERVOIR & BOOSTER STATION
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/13/2003 | RESUBMITTAL | 01/13/2003 | COMPLETED |
08/11/2003 | RESUBMITTAL | 09/04/2003 | COMPLETED |
10/01/2002 | COMMERCIAL NEW | 01/13/2003 | COMPLETED |
10/01/2002 | SITE | 01/13/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T02CM04588
Permit Status: Expired
Permit Description: INSTALL:RESERVOIR & BOOSTER STATION
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/01/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
10/15/2002 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
10/15/2002 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
10/15/2002 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T02CM04588
Permite Description: INSTALL:RESERVOIR & BOOSTER STATION
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
ELECTRIC - CONSTRUCTION POWER | N/A | Not Inspected | ||
ELECTRIC - TEMP POWER FOR TEST | N/A | Not Inspected | ||
07/24/2003 | ELECTRIC - UFER | N/A | Partial Approval | IVRS - Inspection 0000*/ (LARGE PILE OF DIRT TURN IN) APPR. @ CONTROL BUILDING UFER RING SYSTEM AND #6 AWG CU. STABLE FOR WATER BOND AND MISC. |
09/19/2003 | ELECTRIC - INTERMEDIATE | N/A | Partial Approval | IVRS - Inspection 0000*/1) PERMANENT ADDRESS LABEL REQUIRED ON SERVICE. 2) NO RECORD OF UFER INSPECTION. 3) GROUND BUSHINGS ON SUPPLY SIDE OF SERVICE REQUIRED TO HAVE BOND JUMPERS. |
10/02/2003 | PLUMBING - YARD WTR LINE/TEST | N/A | Denied | IVRS - Inspection 0999*/1) PLEASE PROVIDE 3- ADDITIONAL HANGERS ON VENT FROM EYEWASH TO VENT THRU ROOF. 2) PLUMBER TAPE IS NOT AN APPROVED SECURING DEVICE. 3) PLEASE CALL FOR INSPECTION FOR CLOSET RING PRIOR TO TRIM. |
12/16/2003 | BUILDING - FINAL | N/A | Not ready for Inspection | IVRS - Inspection 0000* 1) PROVIDE APPROVED FINAL INSPECTION REPORTS FROM PLUMBING & ELECTRICAL INSPECTORS. 2) PROVIDE COPY OF STAMPED COMPLIANCE REPORT FROM SPEC INSP. 3) STRUCTUALLY COMPLETE. |
12/16/2003 | PLUMBING - FINAL | N/A | Not ready for Inspection | IVRS - Inspection 0000*/ 1) PLEASE WTR SEAL ALL FIXTURES. 2) PLEASE INSTALL VACUUM BREAKER ON ALL HOSE BIBS. 3) PLEASE PROVIDE RPB CERTIFICATION FOR CONTROL BLD. |
Completed Inspections
Permit Status: Expired
Permit Number: T02CM04588
Permit Description: INSTALL:RESERVOIR & BOOSTER STATION
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2003 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection 0000*/ 1) SOIL WATER TEST. 2)NOTE: BLDG DRAIN IS STUBBED OUT @ TWO WAY C.O. LOCATION ONLY. TWO WAY C.O. HAS NOT BEEN INSTALLED @ THIS TIME. |
09/19/2003 | ELECTRIC - ABOVE CEILING | RMAJUTA | Approved | IVRS - Inspection 0000* |
09/22/2003 | ELECTRIC - TEMPORARY SERVICE | JORTA | Approved | SENT TO TEP ON 0923AM |
09/22/2003 | ELECTRIC - CABLE DROP | JORTA | Approved | IVRS - Inspection 0000*SENT TO TEP ON 0923AM |
10/02/2003 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection 0000* |
10/02/2003 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection 0000* |
10/02/2003 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection 0000*/ 7 EACH PIPE SUPPORTS AT BOOSTER SLAB OK. |
10/08/2003 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
10/10/2003 | ELECTRIC - UNDERGROUND | JORTA | Approved | IVRS - Inspection 0000* |
11/24/2003 | OUTDOOR LIGHTING FINAL | JORTA | Approved | IVRS - Inspection 0000* |
11/24/2003 | ELECTRIC - FINAL | JORTA | Approved | IVRS - Inspection 0000* |
12/16/2003 | BOILER FINAL | LHANLY | Approved | IVRS - Inspection 0000* |
12/16/2003 | BOILER UNFIRED PRESSURE VESSEL | LHANLY | Approved | IVRS - Inspection 0000* |
12/16/2003 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection 0000* |
12/16/2003 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000* |
12/16/2003 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
12/16/2003 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection 0000* |
12/16/2003 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection 0000* |
12/16/2003 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection 0000* |