Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
09/27/2001
Applicant:
RIGGS, CHARLES R
Description:
UPGRADE:ELECTRIC
Contractors:
  • SUN WESTERN CONTRACTORS

Permit Reviews

Permit Number - T01EL02420
Permit Status: Final
Permit Description: UPGRADE:ELECTRIC
Start Date Submittal Complete Date Status  
08/22/2002 ELECTRICAL 08/26/2002 COMPLETED Review Details
10/17/2002 ELECTRICAL 10/17/2002 COMPLETED Review Details
11/15/2002 ELECTRICAL 11/15/2002 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T01EL02420
Permit Status: Final
Permit Description: UPGRADE:ELECTRIC
Total Outstanding Activity Conditions - 1
Date Name
09/27/2001 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T01EL02420
Permit Description: UPGRADE:ELECTRIC
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/12/2002 ELECTRIC - UNDERGROUND RHOLLAND Approved IVRS - Inspection 0000*OK 2-1" PVC COATED RIDGID CONDUIT FROM PUMPS TO CANAPY COLUMN BUILDING #9.
11/07/2002 ELECTRIC - INTERMEDIATE JORTA Approved IVRS - Inspection 0000*
11/07/2002 ELECTRIC - UFER JORTA Approved IVRS - Inspection 0000*NOT READ INSPECTION TO CONTINUE AMONG CORRECTION BELOW I WILL NEED TO CONTINUE A W/"BELOW SES IE. MCC-1 MCC 2,T-2, TRANSFER SWITCHES AND MORE.
1.) TORQUING LETTER RECEIVED OK
2.) NEED TO SEE SECONDARY TERMINATION ARRANGE W/T.E.P. AND CALL 791-5550 X 1136 FOR SCHEDULING. 3.) HEAD ROOM CLEARANCE IN FRONT OF SES IN VIOL. OF 110-26 4.) MIN GROUND SYSTEM RODS, STEEL, WITH WATER AND GAS BOND.
5.) SECODNARY CONDUCTOR CANNOTBE VERIFIED PANEL LB AND W WIRING NOT PER APPROVED PLAN 6.) MCC-2 NEED 1/0 GRND EACH. ALSO MCC-1.
12/19/2002 ELECTRIC - FINAL RMAJUTA Approved IVRS - Inspection 0000*1.) GROUND RODS 2-6' APART
4.) INSULATION ON SEC LL HAND SECTION.
SES & CONDUCTORS OK MBJ OK.
1.) SINCE THIS SWITCH GEAR WAS ONLY REPLACED NOT INCREASED OK FOR EXISTING GAS LINE TO REMAIN.
2.) 2 GROUND RODS ARE REQUIRED TO COMPLETE GROUNDING SYSTEM.
3.) HAVE INSPECTED TIE IN ON GEAR FROM TEP AND VERIFIED TERMINATION, MAIN BONDING JUMPER, REQUESTED 2 EXISTING CONDUITS TO BE RETIED TO GROUND BAR FROM BUSHINGS
4.) APPLYING INSULATION ON BOTTOMM LEFT HAND CONDUCTORS TOO NEAR FRAME.
5.) VERIFIED CHANGE FROM 1/0 GROUNDS TO NEUTRAL FOR MCC-1 & 2 ALSO 350 MCM NEUTRALS TO GROUND NEUTRAL FOR MCC-1 & 2.
CONTRACTOR HAD AN APPROVED CHANGE ON SITE.
03/13/2003 PERMIT FINALED RMAJUTA Approved
03/13/2003 ELECTRIC - ABOVE CEILING RMAJUTA Approved