Revision 3 - Site/Grading/Swppp - VoltaGrid Rita Ranch. Gas distribution center, utilities - distribution system.

Permit Reviews

Permit Number - DP22-0267
Permit Status: Complete
Permit Description: Revision 3 - Site/Grading/Swppp - VoltaGrid Rita Ranch. Gas distribution center, utilities - distribution system.
Start Date Submittal Complete Date Status  
09/26/2022 DEV PKG - OK TO SUBMIT 10/03/2022 COMPLETED Review Details
10/03/2022 DEV PKG 10/18/2022 ACTIVE Review Details
03/15/2023 DEVELOPMENT PACKAGE REVIEW v.3 05/11/2023 APPROVED Review Details
04/18/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 05/23/2025 APPROVED Review Details
10/12/2023 DEVELOPMENT PACKAGE REVIEW v.2 11/20/2023 APPROVED Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 12/08/2022 REQUIRES RESUBMIT Review Details
12/06/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 02/28/2025 APPROVED Review Details
06/08/2023 DEVELOPMENT PACKAGE REVIEW v.1 07/13/2023 REQUIRES RESUBMIT Review Details
01/26/2023 DEVELOPMENT PACKAGE REVIEW v.2 03/10/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0267
Permite Description: Revision 3 - Site/Grading/Swppp - VoltaGrid Rita Ranch. Gas distribution center, utilities - distribution system.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
06/05/2023 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns at this time
05/16/2023 PDSD Engineering Division Pre-Construction SITE N/A Not Ready Reschedule for Thursday.
06/05/2023 COT - ENGR - Stormwater N/A Complete (Recurring) No concerns at this time project is not started .
01/18/2024 SITE - Stormwater Setup and Controls N/A Not Ready Dave Roberts set up a meeting with Magnum paving. I intended the Precon. Inform the contractor that they need to call in every two weeks for swept inspection and any other inspections as needed. Gave Magnum paving the DP number because they are taking over the project from another contractor.
04/24/2024 SITE N/A Partial Pass The water harvest area is still under construction
10/14/2024 SITE - Stormwater Final Inspection N/A Not Ready Notice of termination is needed for this final to be completed
04/05/2024 ENGR Engineering Final N/A Not Ready Trash enclosure #4 vertical and horizontal rebar is in footers and bollard placement is per COT specs and okay to pour concrete.

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0267
Permit Description: Revision 3 - Site/Grading/Swppp - VoltaGrid Rita Ranch. Gas distribution center, utilities - distribution system.
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/05/2023 PDSD Engineering Division Pre-Construction SITE Passed informed the contractor they need to schedule inspection every two weeks for storm water inspection.
03/06/2024 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
03/06/2024 ENGR - Drainage Structures Passed Pole foundation and rebar.good to pour
09/20/2024 PDSD Site/Engineering Division - Landscaping Passed Landscaping has been completed per plan
10/14/2024 COT - FCON - Fire - Final Passed
07/30/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPROVED BY PDSD-3RD SUB_DPP_V2.PDF DOCUMENTS VIEW
APPROVED 224076-VOLTAGRID-ADDMOBILECOMP-STRUCTURAL-CIVIL-IFC-04FEB25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED REVISION 2 03 SITE PLAN_REV4-REV.D1_V1.PDF DOCUMENTS VIEW