Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/05/2024 |
ENGR Engineering Final
|
|
Not Ready |
Trash enclosure #4 vertical and horizontal rebar is in footers and bollard placement is per COT specs and okay to pour concrete. |
| 05/02/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Poured the floor and the apron for the trash enclosure on the south west side of the project |
| 06/12/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to complete the basin on the south east corner of the project. Contractors waiting for TEP to run the electrical lines underneath the basin. |
| 07/30/2025 |
ENGR Engineering Final
|
|
Passed |
|
| 09/20/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Superintendent has informed me that site is not yet completed |
| 10/14/2024 |
ENGR Engineering Final
|
|
Not Ready |
Job is not yet completed as per the super on site, for the engineering final all items/buildings and construction need to be completed. |
| 10/16/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Okay for TCO level 4. possible revision pending. |