Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2024 | SITE | Partial Pass | The water harvest area is still under construction | |
| 05/01/2024 | SITE | Partial Pass | Contractor has not completed the water harvesting areas yet. There’s an issue with right away in them. |