Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP22-0267
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2024 | SITE - Stormwater Setup and Controls | Not Ready | Dave Roberts set up a meeting with Magnum paving. I intended the Precon. Inform the contractor that they need to call in every two weeks for swept inspection and any other inspections as needed. Gave Magnum paving the DP number because they are taking over the project from another contractor. | |
| 06/05/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | No concerns at this time |