Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
09/26/2022
Applicant:
Description:
Site/Grading - Epiroc, Phase 3. New industrial building.

Permit Reviews

Permit Number - DP22-0266
Permit Status: Complete
Permit Description: Site/Grading - Epiroc, Phase 3. New industrial building.
Start Date Submittal Complete Date Status  
09/26/2022 DEV PKG - OK TO SUBMIT 10/06/2022 COMPLETED Review Details
10/14/2022 DEV PKG 10/17/2022 ACTIVE Review Details
10/14/2022 DEV PKG - OK TO SUBMIT 10/14/2022 COMPLETED Review Details
01/19/2023 DEVELOPMENT PACKAGE REVIEW v.2 03/16/2023 REQUIRES RESUBMIT Review Details
03/20/2023 DEVELOPMENT PACKAGE REVIEW v.3 04/19/2023 APPROVED Review Details
10/27/2022 DEVELOPMENT PACKAGE REVIEW v.1 12/01/2022 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0266
Permite Description: Site/Grading - Epiroc, Phase 3. New industrial building.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/21/2023 COT - ENGR - Stormwater N/A Complete (Recurring) All setup and controls are in place concrete washout location at NW corner is contained and cleaned periodically.
04/17/2024 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Please provide inventory list to match what is planted for final approval.
04/17/2024 Final inspection to ensure all landscape and water harvesting SITE N/A Partial Pass Please see landscaping notes
04/17/2024 SITE - Stormwater Final Inspection N/A Partial Pass See previous storm water inspection.

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0266
Permit Description: Site/Grading - Epiroc, Phase 3. New industrial building.
Total Completed Inspections - 18
Date Description Inspector Results Comments
05/22/2023 PDSD Engineering Division Pre-Construction SITE Passed
06/13/2023 SITE - SWPPP Correction Notice Passed
04/16/2024 COT - ENGR - Signage Final Passed The address of 6393–2 is located on the north west corner of the building and is visible from south Campbell.
04/16/2024 PDSD Site/Engineering Division - NPPO Passed
04/17/2024 ENGR - Drainage Structures Passed
04/16/2024 SITE - Stormwater Setup and Controls Passed
04/16/2024 COT - FCON - Fire - Final Passed
04/16/2024 SITE - Zoning Final Passed
04/16/2024 COT - ENGR - Stormwater Passed
04/16/2024 SITE - Stormwater Follow-up Passed
04/16/2024 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
04/16/2024 SITE Passed
04/16/2024 COT - ENGR - Site - Assurance Release Passed
04/30/2024 ENGR Grading Final Passed
04/29/2024 ENGR Engineering Final Passed All items have been completed, this project is approved for a full CO
04/30/2024 PDSD Site/Engineering Division - Landscaping Passed
04/30/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
04/30/2024 SITE - Stormwater Final Inspection Passed

Documents

File Name Document Type  
CONTRACTOR LETTER OF INTENT_V1.PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20230126_115436.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_C9-13-11_REZONING_CONDITIONS_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
1_GEOTECH_V1.PDF DOCUMENTS VIEW
1_EPIROC PHASE III - SWPPP_V1.PDF DOCUMENTS VIEW
2_TSMR EXHIBIT - EPIROC PHASE III_V1.PDF DOCUMENTS VIEW
APPROVED 3_PLAN SET - EPIROC PHASE III - DP - 2023-03-24_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20230126_115436.PDF DOCUMENTS VIEW
1_EPIROC PHASE III - SWPPP_V1.PDF DOCUMENTS VIEW
1_C9-13-11_REZONING_CONDITIONS_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
1_GEOTECH_V1.PDF DOCUMENTS VIEW
1_C9-13-11_REZONING_CONDITIONS_V1.PDF DOCUMENTS VIEW
1_DEV PACKAGE APPLICATION, NO SIGNATURE_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
1_EPIROC PHASE III - SWPPP_V1.PDF DOCUMENTS VIEW
1_GEOTECH_V1.PDF DOCUMENTS VIEW
1_ONLINE PERMIT APPLICATION, RECVD 09.09.22_V1.PDF DOCUMENTS VIEW
1_ONLINE SUBMITTAL PAGE SENT WITH SWPPP, RECVD 10.05.22_V1.PDF DOCUMENTS VIEW
1_RECORDED AVIGATION EASEMENT_V1.PDF DOCUMENTS VIEW
2_CIVIL RESPONSE LETTER - DP - 1ST SUBMITTAL_V1.PDF DOCUMENTS VIEW
2_PLAN SET - EPIROC PHASE III - DP - 2023-01-18_V1.PDF DOCUMENTS VIEW
2_TSMR - PDMR APPLICATION_EPIROC_SIGNED_V1.PDF DOCUMENTS VIEW
2_TSMR EXHIBIT - EPIROC PHASE III_V1.PDF DOCUMENTS VIEW
2_TSMR_MODIFICATIONS LETTER - EPIROC - 2023-01-05_V1.PDF DOCUMENTS VIEW
1_C9-13-11_REZONING_CONDITIONS_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
1_GEOTECH_V1.PDF DOCUMENTS VIEW
1_RECORDED AVIGATION EASEMENT_V1.PDF DOCUMENTS VIEW
2_CIVIL RESPONSE LETTER - DP - 1ST SUBMITTAL_V1.PDF PLANS UNDER REVIEW VIEW
2_TSMR_MODIFICATIONS LETTER - EPIROC - 2023-01-05_V1.PDF PLANS UNDER REVIEW VIEW
2_TSMR EXHIBIT - EPIROC PHASE III_V1.PDF PLANS UNDER REVIEW VIEW
2_TSMR & PDMR APPLICATION_EPIROC_SIGNED_V1.PDF PLANS UNDER REVIEW VIEW
2_PLAN SET - EPIROC PHASE III - DP - 2023-01-18_V1.PDF PLANS UNDER REVIEW VIEW
APPROVED DEVELOPMENT LETTER.PDF DOCUMENTS VIEW
SITE PLAN MARKED.PDF DOCUMENTS VIEW
TEP MAP.PDF DOCUMENTS VIEW
1_C9-13-11_REZONING_CONDITIONS_V1.PDF DOCUMENTS VIEW
1_DEV PACKAGE APPLICATION, NO SIGNATURE_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
1_EPIROC PHASE III - SWPPP_V1.PDF DOCUMENTS VIEW
1_GEOTECH_V1.PDF DOCUMENTS VIEW
1_ONLINE PERMIT APPLICATION, RECVD 09.09.22_V1.PDF DOCUMENTS VIEW
1_ONLINE SUBMITTAL PAGE SENT WITH SWPPP, RECVD 10.05.22_V1.PDF DOCUMENTS VIEW
1_RECORDED AVIGATION EASEMENT_V1.PDF DOCUMENTS VIEW
1_ONLINE SUBMITTAL PAGE SENT WITH SWPPP, RECVD 10.05.22.PDF PLANS UNDER REVIEW VIEW
1_EPIROC PHASE III - SWPPP.PDF PLANS UNDER REVIEW VIEW
1_C9-13-11_REZONING_CONDITIONS.PDF PLANS UNDER REVIEW VIEW
1_DRAINAGE STATEMENT.PDF PLANS UNDER REVIEW VIEW
1_DEV PACKAGE APPLICATION.PDF PLANS UNDER REVIEW VIEW
1_GEOTECH.PDF PLANS UNDER REVIEW VIEW
1_ONLINE PERMIT APPLICATION, RECVD 09.09.22.PDF PLANS UNDER REVIEW VIEW
1_PLAN SET - EPIROC PHASE III - DP - 2022-09-08.PDF PLANS UNDER REVIEW VIEW
1_RECORDED AVIGATION EASEMENT.PDF PLANS UNDER REVIEW VIEW