Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6393 S CAMPBELL AV
Search
Historic Records Requests
Address: 6393 S CAMPBELL AV
Date - 02/25/2025 1:54 p.m.
Total Number Of Historic Records Requests - (1)
Name | Action |
---|---|
Address: 6393 S CAMPBELL AV - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 6393 S CAMPBELL AV
Date - 02/25/2025 1:54 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 02/25/2025 1:54 p.m.
Total Number Of Rezone Cases - (2)
Permits
Address: 6393 S CAMPBELL AV
Date - 02/25/2025 1:54 p.m.
Total Number Of Permits - (49)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-1222-00532 | Complete | 12/29/2022 | 04/28/2023 | Right-of-Way (ROW) - Utility | PRJ239084-1: Cox to Pull 109' through existing conduit, Overlash 1463' to existing aerial, trench 4' and bore 49' to install CATV conduit and place vault for system tie. | |
T17FC01047 | Expired | 12/27/2017 | 07/11/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - Extend existing Fire Sprinkler System to new addition | |
TC-COM-1122-00067 | Complete | 11/08/2022 | 10/27/2024 | BLDG 2 | Commercial Building | New Service Facility |
TR-UTL-1023-02762 | Complete | 10/24/2023 | 12/03/2023 | Right-of-Way (ROW) - Utility | Fire Hydrant Repair | |
DP12-0192 | Complete | 10/24/2012 | 09/15/2013 | Development Package | SITE/GRADING PLAN FOR T12TUP0021 | |
DP13-0201 | Complete | 10/11/2013 | 07/27/2020 | Development Package | DPOriginal drawings stamped were the incorrect set. Correct set stamped and layered on the inco | |
DP22-0266 | Complete | 09/26/2022 | 04/30/2027 | Development Package | Site/Grading - Epiroc, Phase 3. New industrial building. | |
TS-PRM-0924-00399 | Issued | 09/09/2024 | 03/08/2025 | BLDG 2 | Sign - Permanent | Fabricate and Install Illuminated Channel Letters |
TF-FCP-0823-01021 | Complete | 08/22/2023 | 03/05/2024 | BLDG 2 | Fire Construction Permit | Installation of 115 LF of 8" C900 for fire line |
TR-ROW-0723-01016 | Issued | 07/28/2023 | 12/06/2023 | Right-of-Way (ROW) | New Sewer Connection for New One Story Building | |
TR-UTL-0723-02152 | Complete | 07/28/2023 | 10/16/2023 | Right-of-Way (ROW) - Utility | Install Environmental Monitoring Well- 100'Dx2'W. 0700AM-1530PM - WELL OWNER-Morris Air National Guard Base ***PREV PERMIT - TR-UTL- 0523-01457 | |
DP17-0174 | Complete | 07/17/2017 | 09/29/2018 | Development Package | SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1 | |
TR-UTL-0623-01893 | Complete | 06/28/2023 | 08/05/2023 | Right-of-Way (ROW) - Utility | Installing 8" Fire protection Service and 1" water service with 1" potable water meter | |
TF-FCP-0623-00796 | Complete | 06/22/2023 | 01/27/2024 | BLDG 2 | Fire Construction Permit | New Fire Alarm. Dedicated Function Sprinkler Monitor Plus Evacuation. |
DP17-0134 | Complete | 06/13/2017 | 02/19/2018 | Development Package | SITE | |
TF-FCP-0623-00736 | Complete | 06/05/2023 | 06/27/2024 | BLDG 2 | Fire Construction Permit | New fire sprinkler system for ground up construction. |
TR-UTL-0523-01457 | Issued | 05/04/2023 | 07/14/2023 | Right-of-Way (ROW) - Utility | Install Environmental Monitoring Well- 100'Dx2'W. 0700AM-1530PM - WELL OWNER-Morris Air National Guard Base *** | |
TC-CFO-0424-00089 | Denied | 04/25/2024 | N/A | BLDG 2 | Certificate of Occupancy | This project needs the okay for a Temp Certificate of Occupancy from a Engineering Inspector and level for the building. Please schedule engineering final for this project and re-request Temporary Certificate of Occupancy when ready. New Service Facility |
TC-CFO-0424-00086 | Denied | 04/17/2024 | N/A | BLDG 2 | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from a Engineering Inspector AND the level of occupancy for the building. Please schedule Site Engineering Final. Once you get the okay from Engineering inspector please re-request TCO. New Service Facility |
TF-FCP-0324-00212 | Complete | 03/18/2024 | 09/28/2024 | BLDG 2 | Fire Construction Permit | Offsite monitoring of the existing fire panel at this location |
DS18-06 | Approved | 02/20/2018 | N/A | Zoning Compliance | ATLAS COPCO - TSMR PAG DETAIL AT ATLAS COPCO | |
TR-UTL-0124-00129 | Complete | 01/22/2024 | 03/23/2024 | Right-of-Way (ROW) - Utility | (1) 4' x 4' bell hole in pavement along with an approx. 2' x 18' trench in pavement for new gas services | |
TF-FCP-0124-00017 | Complete | 01/08/2024 | 07/17/2024 | BLDG 1 | Fire Construction Permit | install a cellular transmitter to monitor the existing building fire alarm |
DP12-0229 | VOID | 12/05/2012 | N/A | DEVPKG | SITE ONLY FOR CONSTRUCTION/MINING YARD | |
T00ME01095 | FINAL | 10/13/2000 | 02/20/2001 | MECH | PRESSURE VESSEL INSPECTION: TUC-24351 | |
T07OT00913 | FINAL | 04/18/2007 | 12/30/2008 | SIGN | 12980 | |
T12BU01217 | FINAL | 10/12/2012 | 04/10/2013 | WALL/FEN | ZONING COMPLIANCE; 6' FENCE AROUND EQUIPMENT YARD | |
T12CM07696 | C OF O | 12/05/2012 | 08/19/2013 | COMBO | TI: CONSTRUCTION/MINING OFFICE | |
T12TUP0021 | WITHDRWN | 10/10/2012 | N/A | TUP | FOR OUTDOOR STORAGE | |
T13BU00122 | FINAL | 01/29/2013 | 08/10/2013 | SPKLR | Relocate 5 fire sprinklers | |
T13BU00161 | FINAL | 02/08/2013 | 08/10/2013 | BUILD | Install electrical tamper switch for sprinkler monitoring | |
T13BU00173 | VOID | 02/13/2013 | N/A | SPKLR | Install new fire alarm panel | |
T13BU00174 | FINAL | 02/13/2013 | 08/19/2013 | BUILD | Install new fire alarm panel | |
T13CM01573 | WITHDRWN | 03/19/2013 | N/A | COMBO | RACKING FOR WAREHOUSE | |
T13EX00206 | CLOSED | 02/12/2013 | 04/13/2013 | EXCAV | INSTALL 1;6LF X 24' W ASPHALT ENTRYWAY FROM BACK OF SIDEWALK TO PROPERTY LINE. SIDEWALK MUST BE 6 INCHES THICK OTHERWISE IT IS THE RESPONSIBILITY OF THE PROPERTY OWNER BROKEN SIDEWALK. INSTALL SIDWALK SCUPPER PER APPROVED PLAN. | |
T13OT00147 | FINAL | 02/01/2013 | 10/09/2013 | SIGN | 3- NON-ILLUM WALL SIGNS / 1- C OF C ON DF. | |
T16RW01109 | VOID | 08/17/2016 | N/A | ROW | TEP TO INSTALL EQUIPMENT ON EXISTING POLE WORK ORDER # 6125865 | |
T17CM04587 | C OF O | 06/13/2017 | 03/06/2018 | COMBO | ADDITION; ATLAS COPCO | |
T17CM05428 | VOID | 07/17/2017 | N/A | COMBO | NEW CANOPY, PARKING LOT & BLDG EXPANSION | |
T17CM06300 | C OF O | 08/16/2017 | 10/02/2018 | COMBO | CONSTRUCTION EQUIPMENT WHOLESALE | |
T17CM08408 | EXPIRED | 11/09/2017 | 06/04/2018 | COMBO | STORAGE RACKS | |
T17FC00594 | FINAL | 07/24/2017 | 02/07/2018 | FIRECONS | REPLACE 165 UPRIGHT SPRINKLERS & ADD 5 SIDEWALLS FOR RACK STORAGE | |
T17FC00597 | FINAL | 07/24/2017 | 02/19/2018 | FIRECONS | Add Notificationb to Tenant TI - 7 Devices | |
T17RW04592 | FINAL | 10/17/2017 | 12/15/2017 | ROW | DEMO AND REMOVAL OF (3) EXISTING APPROACHES AND CONSTRUCT (1) NEW DP17-0174 | |
T18FC00036 | FINAL | 01/10/2018 | 07/17/2018 | FIRECONS | ADD HORN STROBES TO EXISTING SYSTEM. | |
T18RW00134 | FINAL | 01/04/2018 | 03/09/2018 | ROW | WORKING WITHOUT A PEMIT. DRIVEWAY INSTALL DOES NOT MEET CODE. WIDENING THE RADIUS OF 3 EXISTING APPROACHES AND CUT/PAVE 1 NEW APPROACH. HANDICAP RAMPS TO TIE INTO EXISTING SIDEWALKS DP17-0174 | |
T20CM07356 | L OF C | 10/26/2020 | 08/23/2021 | COMBO | HVAC UPGRADE | |
T21RW04879 | FINAL | 11/02/2021 | 04/01/2022 | ROW | CREW TO PERFORM AERIAL MAINTENANCE ON EXISTING POLE 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | |
TUC-24351 | CERTIFIC | 07/03/1997 | 08/24/2003 | VESSEL |
Plans
Address: 6393 S CAMPBELL AV
Date - 02/25/2025 1:54 p.m.
Total Number Of Plans - (10)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-17-0174 | Active | 07/17/2017 | 09/29/2018 | -- Commercial Water Harvesting Ordinance | SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1 | |
CWH-22-0266 | Submitted | 09/26/2022 | 09/26/2023 | -- Commercial Water Harvesting Ordinance | Site/Grading - Epiroc, Phase 3. New industrial building. | |
T17BA00007 | Approved | 11/09/2017 | N/A | -- Stormwater Basin | ||
T17BA00008 | Approved | 11/09/2017 | N/A | -- Stormwater Basin | ||
T17BA00009 | Approved | 11/13/2017 | N/A | -- Stormwater Basin | ||
TE-BAS-0923-00180 | Active | 09/05/2023 | N/A | -- Commercial Water Harvesting Ordinance | Site/Grading - Epiroc, Phase 3. New industrial building. | |
C9-13-11 | EFFECTED | 10/18/2013 | N/A | REZONING PROCEDURES -- REZONE | Rezone from PI to I-1 to allow the sale, repair, service, and storage of mining equipment, paving equipment and compressors. Project includes administrative offices within an existing 19,736 square foot, 26-foot high steel building located in the south portion of the rezoning site. | |
T05BA00598 | ACTIVE | 12/12/2005 | N/A | Detention Basin -- DETBSN | ||
T08PRE0044 | APPLIED | 04/11/2008 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Proposed artifical palm tree, 65 feet tall, to conceal wireless antenna and associated ground mounted equipment. | |
T13PRE0039 | CLOSED | 06/03/2013 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS |
Record Requests
Address: 6393 S CAMPBELL AV
Date - 02/25/2025 1:54 p.m.
Total Number Of Requests - (5)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0524-03311 | Denied | 05/02/2024 | N/A | Requests | This Project is not complete all conditions need to be satisfied. A final special inspection certificate needs to be submitted. Please re-request once all associated projects are in completed status. TC-COM-1122-00067 New Service Facility |
REQ-0524-03402 | Denied | 05/07/2024 | N/A | Requests | This Project is not complete all conditions need to be satisfied. Please re-request once all conditions have been satisfied and review has been completed. New Service Facility |
REQ-0524-03436 | Complete | 05/08/2024 | 05/08/2024 | Requests | New Service Facility |
REQ-0623-03122 | Complete | 06/05/2023 | 06/07/2023 | Requests | Install Environmental Monitoring Well- 100'Dx2'W. 0700AM-1530PM - WELL OWNER-Morris Air National Guard Base *** RENEW 60 DAYS |
REQ-0923-04733 | Complete | 09/01/2023 | 09/01/2023 | Requests | New Sewer Connection for New One Story Building - Per Michelle McConell requesting 90 day extension as of 09/07/2023. |