Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2024 | ENGR Engineering Final | Partial Pass | 1) move handicap sign to the right space next to where it is now and cross hatch the space it occupies now for a van accessible space. Or as discussed add one more handicap space. 2) need gutter and downspout on pedestrian walkway at dbl door overhang. 3) add bollard to protect gas meter and pipe. 4) protect all disturbed areas with,hydro seed, dg rock, hand seed or something to protect from washouts. 5) downspouts on the west side need protection from washout. |
|
| 04/17/2024 | ENGR Engineering Final | Passed | ||
| 04/29/2024 | ENGR Engineering Final | Passed | All items have been completed, this project is approved for a full CO |