Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP22-0098
Permit Details
Apply Date:
04/18/2022
Applicant:
Michelle McConnell
Description:
Site/Grading/Swppp - World of Play, Reid Park Zoo. Demolition of existing zoo exhibit, construction
Permit Reviews
Permit Number - DP22-0098
Permit Status: Complete
Permit Description: Site/Grading/Swppp - World of Play, Reid Park Zoo. Demolition of existing zoo exhibit, construction
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/18/2022 | DEV PKG - OK TO SUBMIT | 04/25/2022 | COMPLETED |
05/11/2022 | DEV PKG | 07/06/2022 | COMPLETED |
07/25/2022 | DEV PKG - RESUBMITTAL | 08/05/2022 | COMPLETED |
11/23/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/30/2022 | APPROVED |
12/01/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/05/2022 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0098
Permite Description: Site/Grading/Swppp - World of Play, Reid Park Zoo. Demolition of existing zoo exhibit, construction
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/09/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Warmed up for the HEADWALL’s on the south west side of the project good pour |
10/23/2023 | ENGR Engineering Final | N/A | Not Ready | Super Will recall for the 23rd or 24th of Oct. |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0098
Permit Description: Site/Grading/Swppp - World of Play, Reid Park Zoo. Demolition of existing zoo exhibit, construction
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/02/2022 | SITE - SWPPP Correction Notice | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} | |
09/02/2022 | SITE - SWPPP Violation Notice | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} | |
09/02/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} | |
10/19/2023 | SITE - Stormwater Follow-up | Passed | ||
10/19/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
10/19/2023 | SITE - Stormwater Setup and Controls | Passed | ||
10/19/2023 | PDSD Site/Engineering Division - Landscaping | Passed | All (211) Shrubs, (6) 36” box Canary Islands Pine trees, (12) 24” box Bamboo are accounted for. | |
10/19/2023 | COT - ENGR - Signage Final | Passed | Non Applicable. | |
10/19/2023 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
10/19/2023 | COT - ENGR - Stormwater | Passed | ||
10/19/2023 | COT - FCON - Fire - Final | Passed | ||
10/19/2023 | SITE - Stormwater Final Inspection | Passed | ||
10/19/2023 | SITE - Zoning Final | Passed | ||
10/23/2023 | ENGR Grading Final | Passed | ||
11/13/2023 | ENGR Engineering Final | Passed | This was for the cleanup of the rear construction area behind World of Play. |