Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 01/25/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
The stormwater set up and control is good at this time. The contractor has pour pour concrete for stem walls and retaining walls without a city inspection. They’re in the progress of excavating for catch basin I informed the contractor to give us a call before pouring. I also informed the contractor that they need to call Lynn every two weeks for inspections |
| 03/01/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Settings steel for six catch basins everything’s good at this time |
| 10/19/2023 |
SITE - Stormwater Setup and Controls |
|
Passed |
|
| 12/06/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Good to backfill the storm drain |