Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP22-0098
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/19/2023 | ENGR Engineering Final | Not Ready | Will recall inspection when all fencing for site is removed so all finals can be completed 100 %. SE entry area has a 6’ radius section of 34” tall brown wrought iron fencing that needs to be installed prior to recall of inspection. COT will review plan for handicap railing measurements thru out playground areas. |
|
10/19/2023 | ENGR Engineering Final | Not Ready | Will recall inspection when all fencing for site is removed so all finals can be completed 100 %. SE entry area has a 6’ radius section of 34” tall brown wrought iron fencing that needs to be installed prior to recall of inspection. COT will review plan for handicap railing measurements thru out playground areas. |
|
10/19/2023 | ENGR Engineering Final | Not Ready | Will recall inspection when all fencing for site is removed so all finals can be completed 100 %. SE entry area has a 6’ radius section of 34” tall brown wrought iron fencing that needs to be installed prior to recall of inspection. COT will review plan for handicap railing measurements thru out playground areas. |
|
10/23/2023 | ENGR Engineering Final | Not Ready | Super Will recall for the 23rd or 24th of Oct. | |
10/23/2023 | ENGR Engineering Final | Not Ready | Super Will recall for the 23rd or 24th of Oct. | |
10/23/2023 | ENGR Engineering Final | Not Ready | Super Will recall for the 23rd or 24th of Oct. | |
10/24/2023 | ENGR Engineering Final | Partial Pass | TC of O level 4 recall of inspection required after site is 100% completed. | |
10/24/2023 | ENGR Engineering Final | Partial Pass | TC of O level 4 is approved recall of inspection is required when all site and asphalt work is 100 % completed. | |
11/13/2023 | ENGR Engineering Final | Passed | ||
11/13/2023 | ENGR Engineering Final | Passed | This was for the cleanup of the rear construction area behind World of Play. |