Permit Details

Status:
Complete
Type:
Development Package
Address:
475 N GRANADA AV
Address NEW:
475 N GRANADA AV
Apply Date:
04/08/2022
Applicant:
Brian Potter
Description:
Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult

Permit Reviews

Permit Number - DP22-0091
Permit Status: Complete
Permit Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Start Date Submittal Complete Date Status  
04/08/2022 DEV PKG - OK TO SUBMIT 04/15/2022 COMPLETED Review Details
04/15/2022 DEV PKG - OK TO SUBMIT 04/26/2022 COMPLETED Review Details
04/26/2022 DEV PKG 07/13/2022 COMPLETED Review Details
08/16/2022 DEV PKG - RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/10/2022 DEV PKG - RESUBMITTAL 10/20/2022 ACTIVE Review Details
12/02/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 01/06/2025 APPROVED Review Details
10/27/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/02/2022 APPROVED Review Details
08/08/2024 DEVELOPMENT PACKAGE REVIEW v.1 08/26/2024 REQUIRES RESUBMIT Review Details
02/09/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/07/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0091
Permite Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
05/30/2023 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) Inform the contractor to call in for inspections every two weeks for the DP Permit
10/19/2023 SITE - Stormwater Follow-up N/A Partial Pass Water ponding on existing pavement at north site entrance and on east parking area
12/13/2023 SITE - Stormwater Setup and Controls N/A Partial Pass
04/16/2024 COT - ENGR - Stormwater N/A Partial Pass 24 inch HDPE as shown
11/21/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready Seven barrel cactus remain in parking lot
01/23/2025 COT - SITE - Zoning Intermediate N/A Not Applicable
10/03/2023 ENGR - Drainage Structures N/A Re-inspection required Double trash enclosure at south east corner of site, footing and slab poured without inspection.
08/11/2023 SITE N/A Partial Pass
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0091
Permit Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Total Completed Inspections - 12
Date Description Inspector Results Comments
10/10/2023 PDSD Engineering Division Pre-Construction SITE Passed Scott with G and J
06/25/2024 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
11/04/2024 Consultation SITE Passed Okay for Full C of O for Building 1
11/27/2024 PDSD Site/Engineering Division - Landscaping Passed All of the site landscape punch list items have been satisfied per my inspection today.

Recommended action items: Remove all nursery stakes from all trees and remove traditional stakes from multi-trunk trees.
12/05/2024 For trash and recycling enclosures Passed
01/23/2025 ENGR Grading Final Passed
01/23/2025 SITE - Stormwater Final Inspection Passed
01/02/2025 SITE Passed Remove nursery stakes from all trees, and stakes from multi-trunk trees.
02/05/2025 COT - ENGR - Signage Final Passed
02/04/2025 SITE - Zoning Final Passed Site improvements per approved DP. Existing non-compliant items must be addressed in future construction phases.
02/04/2025 ENGR Engineering Final Passed Site improvements per approved DP. Existing non-compliant items must be addressed in future construction phases.
01/29/2025 COT - FCON - Fire - Final Passed