Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
|
| 09/29/2023 |
ENGR - Drainage Structures |
|
Not Ready |
|
| 09/29/2023 |
ENGR - Drainage Structures |
|
Not Ready |
Scott |
| 10/03/2023 |
ENGR - Drainage Structures |
|
Re-inspection required |
Double trash enclosure at south east corner of site, footing and slab poured without inspection. |
| 10/18/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Photo documentation provided for trash enclosure slab |
| 11/21/2023 |
ENGR - Drainage Structures |
|
Not Ready |
|
| 11/29/2023 |
ENGR - Drainage Structures |
|
Not Ready |
|
| 12/03/2024 |
ENGR - Drainage Structures |
|
Not Applicable |
|