Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP22-0091
Permit Details
Apply Date:
04/08/2022
Applicant:
Scott Price
Description:
Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Permit Reviews
Permit Number - DP22-0091
Permit Status: In revision
Permit Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/08/2022 | DEV PKG - OK TO SUBMIT | 04/15/2022 | COMPLETED |
04/15/2022 | DEV PKG - OK TO SUBMIT | 04/26/2022 | COMPLETED |
04/26/2022 | DEV PKG | 07/13/2022 | COMPLETED |
08/16/2022 | DEV PKG - RESUBMITTAL | 09/26/2022 | COMPLETED |
10/10/2022 | DEV PKG - RESUBMITTAL | 10/20/2022 | ACTIVE |
12/02/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | N/A | IN REVIEW |
10/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/02/2022 | APPROVED |
08/08/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 08/26/2024 | REQUIRES RESUBMIT |
02/09/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/07/2023 | APPROVED |
Outstanding Inspections
Permit Status: In Revision
Permit Number: DP22-0091
Permite Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - FCON - Fire - Final | N/A | Not Ready | ||
05/30/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Inform the contractor to call in for inspections every two weeks for the DP Permit |
10/19/2023 | SITE - Stormwater Follow-up | N/A | Partial Pass | Water ponding on existing pavement at north site entrance and on east parking area |
12/13/2023 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | |
04/16/2024 | COT - ENGR - Stormwater | N/A | Partial Pass | 24 inch HDPE as shown |
08/11/2023 | SITE | N/A | Partial Pass | |
05/30/2024 | COT - ENGR - Signage Final | N/A | Partial Pass | |
11/21/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Seven barrel cactus remain in parking lot |
COT - SITE - Zoning Intermediate | N/A | Scheduled | ||
10/03/2023 | ENGR - Drainage Structures | N/A | Re-inspection required | Double trash enclosure at south east corner of site, footing and slab poured without inspection. |
SITE - Stormwater Final Inspection | N/A | Scheduled |
Completed Inspections
Permit Status: In Revision
Permit Number: DP22-0091
Permit Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Scott with G and J | |
06/25/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
11/04/2024 | Consultation SITE | Passed | Okay for Full C of O for Building 1 | |
11/27/2024 | PDSD Site/Engineering Division - Landscaping | Passed | All of the site landscape punch list items have been satisfied per my inspection today. Recommended action items: Remove all nursery stakes from all trees and remove traditional stakes from multi-trunk trees. |
|
12/05/2024 | For trash and recycling enclosures | Passed |
Scheduled Inspections
Scheduled Inspections - DP22-0091
Status: In Revision
Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
12/04/2024 | COT - SITE - Zoning Intermediate | Scheduled | |
12/17/2024 | ENGR Grading Final | Scheduled | |
12/17/2024 | SITE - Stormwater Final Inspection | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.