Permit: DP22-0091
Permit Details
Apply Date:
04/08/2022
Applicant:
Brian Potter
Description:
Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Permit Reviews
Permit Number - DP22-0091
Permit Status: Complete
Permit Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2022 | DEV PKG - OK TO SUBMIT | 04/15/2022 | COMPLETED |
| 04/15/2022 | DEV PKG - OK TO SUBMIT | 04/26/2022 | COMPLETED |
| 04/26/2022 | DEV PKG | 07/13/2022 | COMPLETED |
| 08/16/2022 | DEV PKG - RESUBMITTAL | 09/26/2022 | COMPLETED |
| 10/10/2022 | DEV PKG - RESUBMITTAL | 10/20/2022 | ACTIVE |
| 12/02/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/06/2025 | APPROVED |
| 10/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/02/2022 | APPROVED |
| 08/08/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 08/26/2024 | REQUIRES RESUBMIT |
| 02/09/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/07/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0091
Permite Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Inform the contractor to call in for inspections every two weeks for the DP Permit |
| 10/19/2023 | SITE - Stormwater Follow-up | N/A | Partial Pass | Water ponding on existing pavement at north site entrance and on east parking area |
| 12/13/2023 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | |
| 04/16/2024 | COT - ENGR - Stormwater | N/A | Partial Pass | 24 inch HDPE as shown |
| 11/21/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Seven barrel cactus remain in parking lot |
| 01/23/2025 | COT - SITE - Zoning Intermediate | N/A | Not Applicable | |
| 10/03/2023 | ENGR - Drainage Structures | N/A | Re-inspection required | Double trash enclosure at south east corner of site, footing and slab poured without inspection. |
| 08/11/2023 | SITE | N/A | Partial Pass | |
| COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0091
Permit Description: Revision #2 *Revision #1 (fire hydrant/access) started 8/8/24* Site/Grading - City Center Development, Hotel Tucson City Center. Redevelop existing hotel into mult
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Scott with G and J | |
| 06/25/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
| 11/04/2024 | Consultation SITE | Passed | Okay for Full C of O for Building 1 | |
| 11/27/2024 | PDSD Site/Engineering Division - Landscaping | Passed | All of the site landscape punch list items have been satisfied per my inspection today. Recommended action items: Remove all nursery stakes from all trees and remove traditional stakes from multi-trunk trees. |
|
| 12/05/2024 | For trash and recycling enclosures | Passed | ||
| 01/23/2025 | ENGR Grading Final | Passed | ||
| 01/23/2025 | SITE - Stormwater Final Inspection | Passed | ||
| 01/02/2025 | SITE | Passed | Remove nursery stakes from all trees, and stakes from multi-trunk trees. | |
| 02/05/2025 | COT - ENGR - Signage Final | Passed | ||
| 02/04/2025 | SITE - Zoning Final | Passed | Site improvements per approved DP. Existing non-compliant items must be addressed in future construction phases. | |
| 02/04/2025 | ENGR Engineering Final | Passed | Site improvements per approved DP. Existing non-compliant items must be addressed in future construction phases. | |
| 01/29/2025 | COT - FCON - Fire - Final | Passed |