Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
04/06/2022
Applicant:
Description:
Grading - TMC Rincon Hospital.

Permit Reviews

Permit Number - DP22-0082
Permit Status: Complete
Permit Description: Grading - TMC Rincon Hospital.
Start Date Submittal Complete Date Status  
04/06/2022 DEV PKG - OK TO SUBMIT (GRADING ONLY) 04/07/2022 COMPLETED Review Details
04/07/2022 GRADING 04/08/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP22-0082
Permit Status: Complete
Permit Description: Grading - TMC Rincon Hospital.
Total Outstanding Activity Conditions - 1
Date Name
04/06/2022 1. No offsite clearing or grading is authorized by this permit. No clearing or grading into the wash area owned by the Sierra Morado HOA is allowed by this permit.2. Native Plant Preservation Plan implementation and reporting will be required for this rough grading project.3. The Stormwater Pollution Prevention Plan must be implemented before any ground-disturbing activities are started.4. Schedule a pre-construction inspection before any ground-disturbing activities are started.

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0082
Permite Description: Grading - TMC Rincon Hospital.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
04/18/2022 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) {Activity date: 04/18/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN TALK TO Mark Johnson from JE DUNN CONSTRUCTION .INFORMED THEM ABOUT A MEETING EVERY TWO WEEKS .WILL START GRUBBING ON MONDAY OF NEXT WEEK.}
06/26/2023 SITE - SWPPP Violation Notice N/A Complete (Recurring) No concerns at this time
01/02/2024 PDSD Site/Engineering Division - Landscaping N/A Partial Pass The contractor needs to complete the planning of the plants. Hydro seeding the areas. It needs to be hydroseeding and plays the rocks at the curb cut outs.
01/02/2024 SITE - Stormwater Follow-up N/A Partial Pass No concerns at this time. Everything looks good.
01/02/2024 ENGR Engineering Final N/A Partial Pass The contractor needs to complete the planning of the plants. Hydro seeding the areas. It needs to be hydroseeding and plays the rocks at the curb cut outs.

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0082
Permit Description: Grading - TMC Rincon Hospital.
Total Completed Inspections - 10
Date Description Inspector Results Comments
06/08/2023 SITE - Stormwater Setup and Controls Passed
10/16/2023 SITE - SWPPP Correction Notice Passed No corrections needed at this time
10/16/2023 SITE - SWPPP Violation Notice Passed No concerned at this time, no violations seen.
12/28/2023 COT - ENGR - Signage Final Passed
01/02/2024 SITE - Stormwater Final Inspection Passed
01/02/2024 PDSD Site/Engineering Division - NPPO Passed
01/02/2024 ENGR Grading Final Passed
01/09/2024 PDSD Site/Engineering Division - Landscaping Passed
01/11/2024 SITE - Stormwater Follow-up Passed
01/11/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
SIGNED PERMIT.PDF DOCUMENTS VIEW