Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 01/02/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to complete planning the plants, HYDROSEEDING repair the damage, sidewalks and curb |
| 01/02/2024 |
ENGR Engineering Final
|
|
Partial Pass |
The contractor needs to complete the planning of the plants. Hydro seeding the areas. It needs to be hydroseeding and plays the rocks at the curb cut outs. |
| 01/04/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to remove the fence, fix the damage, sidewalk and curb and remove all of the construction equipment. Cleaned out the parking lot areas. |
| 01/09/2024 |
ENGR Engineering Final
|
|
Passed |
Good for C Of O. |
| 01/11/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 12/28/2023 |
ENGR Engineering Final
|
|
Partial Pass |
contractor still needs to complete the landscaping, some of the storm drain outlets, HYDROSEEDING, and D G. |