Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP22-0082
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/18/2022 | ENGR Grading Final | MHERNANDEZ | Not Applicable | Entered by VVERA1 - CHECK FOR ACTIVITY/NA |
06/15/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN /GRADING FOR THE BUILDING PADS . WATTLES ARE IN PLACE .CONTRACTOR NEED TO ADD MORE TRACK OUT ROCK |
01/02/2024 | ENGR Grading Final | Passed | ||
01/02/2024 | ENGR Grading Final | Passed | ||
06/01/2023 | ENGR Grading Final | Complete (Recurring) | Inspecting the rebar for the HEADWALL’s around the spiral rib pipe contractors are missing number four bars on each side of the 24 inch pipes and the layout is 2 foot on center. | |
06/08/2023 | ENGR Grading Final | Complete (Recurring) | LOOKED AT THE HEADWALLS BEING CONSTRUCTED AT THE NORTH WEST QUADRANT AND ALONG THE SOUTH SIDE OF THE PROJECT. THE CONTRACTOR HAS INSTALLED THE REBAR BUT HAVE NOT PLACED THE FORMS FOR THE WALL AT THIS TIME. | |
06/26/2023 | ENGR Grading Final | Complete (Recurring) | Contractors cutting subgrade for the parking lot and part of the roadway | |
07/19/2023 | ENGR Grading Final | Partial Pass | Grading for the roads and parking lot | |
10/16/2023 | ENGR Grading Final | Partial Pass | In progress |