Permit: DP22-0011
Permit Details
Status:
Complete
Type:
Development Package
Address:
6430 S COMMERCE CT
Address NEW:
6430 S COMMERCE CT
Apply Date:
01/27/2022
Applicant:
Description:
Site/Grading - CAP Valencia indoor storage facility.
Permit Reviews
Permit Number - DP22-0011
Permit Status: Complete
Permit Description: Site/Grading - CAP Valencia indoor storage facility.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/27/2022 | DEV PKG - OK TO SUBMIT | 02/07/2022 | COMPLETED |
| 02/07/2022 | DEV PKG | 08/01/2022 | COMPLETED |
| 07/05/2022 | DEV PKG - RESUBMITTAL | 08/25/2022 | COMPLETED |
| 10/19/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/14/2022 | APPROVED |
Conditions
Permit Number - DP22-0011
Permit Status: Complete
Permit Description: Site/Grading - CAP Valencia indoor storage facility.
| Date | Description | Comments |
|---|---|---|
| 06/05/2025 | Planset refers to commerce court address. | |
| 12/06/2022 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 01/25/2023 | Dust Control/Air Quality Permit is Required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0011
Permite Description: Site/Grading - CAP Valencia indoor storage facility.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2024 | NPPO Pre-Construction | N/A | Not Ready | |
| 02/05/2025 | ENGR - Drainage Structures | N/A | Canceled | |
| 07/03/2025 | SITE - SWPPP Correction Notice | N/A | Re-inspection required | 1) water harvesting directly in frt of the building needs curb cuts asap. Also base is too low to work correctly with drainage channel. 2) water harvesting on the south side of the building, once dry all equipment, dumpsters, port-a-Jon’s need to be moved as well as the office and all Conex boxes and materials and trash. 3) basin on the south side of building is not graded correctly, water should not be holding at the east end. This basin might need to be looked at for water to be able to perk correctly. water should not be holding after the 12 hr mark. 4) west basin needs to be completed but no water is holding. 5) need to check grade hgt. on plans to ensure that water from drive and Big 5 parking lot is not intended to be draining into the site basins. |
| 08/06/2024 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | Track pad has been ruined and dose not exist any longer. This needs to be rebuilt ASAP. Continued sweeping needs to be done along street adjacent to the track pad. No other BMPs have been installed as per plan. |
| 09/11/2025 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Contractor will reschedule not ready |
| 09/11/2025 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Contractor was rescheduled for tomorrow |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0011
Permit Description: Site/Grading - CAP Valencia indoor storage facility.
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 02/11/2025 | Passed | 02/11/25, compaction has been completed and will again be reviewed at finial grade prior to paving. | ||
| 04/23/2025 | Passed | Final look and appearance meet the intent of the plans. | ||
| 04/23/2025 | Consultation SITE | Passed | The ADA ramp,on the south side of the entrance needs to be moved to the east so as to have proper depth of ramp and off slopes. The walkway coming around the junction box will narrow to the minimum requirement of 4' | |
| 08/19/2025 | COT - ENGR - Stormwater | Passed | This item was repaired at time of construction | |
| 08/19/2025 | SITE - Stormwater Setup and Controls | Passed | ||
| 08/27/2025 | For trash and recycling enclosures | Passed | ||
| 08/27/2025 | COT - FCON - Fire - Final | Passed | ||
| 08/29/2025 | ENGR Engineering Final | Passed | ||
| 09/12/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 09/12/2025 | COT - BASN - Drainage/Basin - Condition Inspection | Passed |