Permit: DP22-0011

Parcel: 13727991E

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP22-0011

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Not Ready

Date Description Inspector Results Comments
06/27/2024 SITE - Stormwater Setup and Controls Not Ready
07/01/2024 SITE - Stormwater Setup and Controls Complete (Recurring) Track pad has been redone but that is it. Addressing, SWPPP, Silt Fence, Perimeter Fence, General cleanup, Sidewalk area on east gate needs to have trees cut down for visibility. Road. cleanup at track pad area.
Some of these things are at an urgent status and need to be done ASAP.