Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP22-0011
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | ENGR Engineering Final | Not Ready | All areas used during construction now have to be mitigated to be a stabilized surface, hydro seed, dg, gorilla-snot all are acceptable means of stabilization. All trash, temp power pole, temp signs need to be removed. Dumpster and fenced area needs to be removed unless customer is taking responsibility for them. Inspections still to call; Landscaping Stormwater final Sign finals Water harvesting |
|
| 08/27/2025 | ENGR Engineering Final | Partial Pass | Once landscaping is completed and curbs are repaired this can be signed off. TCO4 is okay to aquire. | |
| 08/29/2025 | ENGR Engineering Final | Passed |