Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
01/14/2022
Applicant:
David Little
Description:
Site/Grading/Swppp - QuikTrip store # 1480.

Permit Reviews

Permit Number - DP22-0003
Permit Status: Complete
Permit Description: Site/Grading/Swppp - QuikTrip store # 1480.
Start Date Submittal Complete Date Status  
01/14/2022 DEV PKG - OK TO SUBMIT 01/28/2022 COMPLETED Review Details
01/28/2022 DEV PKG 08/01/2022 COMPLETED Review Details
06/10/2022 DEV PKG - RESUBMITTAL 08/15/2022 COMPLETED Review Details
08/31/2022 DEV PKG - RESUBMITTAL 09/28/2022 COMPLETED Review Details
10/04/2022 DEV PKG - RESUBMITTAL 10/07/2022 COMPLETED Review Details
06/05/2023 DEVELOPMENT PACKAGE NEW v.1 06/15/2023 APPROVED Review Details
04/07/2023 DEVELOPMENT PACKAGE REVIEW v.1 05/24/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0003
Permite Description: Site/Grading/Swppp - QuikTrip store # 1480.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/22/2022 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) Had a pre-con with a contractor in the conversation with the contractor I am formed him that he needed to have an inspection every two weeks and the waddles Need to be staked I also gave him a detailed plan for the trash enclosures
02/17/2023 SITE - SWPPP Violation Notice N/A Not Applicable Stormwater follow up inspection good.

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0003
Permit Description: Site/Grading/Swppp - QuikTrip store # 1480.
Total Completed Inspections - 10
Date Description Inspector Results Comments
01/13/2023 PDSD Site/Engineering Division - NPPO Passed I inspected the trash enclosure putting pour it has been completed at this time
01/20/2023 PDSD Engineering Division Pre-Construction SITE Passed N/A
08/16/2023 SITE - Stormwater Final Inspection Passed
08/16/2023 ENGR Grading Final Passed
08/16/2023 SITE - SWPPP Correction Notice Passed
08/16/2023 PDSD Site/Engineering Division - Landscaping Passed
09/20/2023 COT - ENGR - Signage Final Passed
10/24/2023 SITE - Stormwater Setup and Controls Passed
10/24/2023 SITE - Stormwater Follow-up Passed
10/24/2023 ENGR Engineering Final Passed