Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 01/20/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
N/A |
| 12/22/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Complete (Recurring) |
Had a pre-con with a contractor in the conversation with the contractor I am formed him that he needed to have an inspection every two weeks and the waddles Need to be staked I also gave him a detailed plan for the trash enclosures |