Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 03/06/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Contractor install 12 inch HDPE pipe handsome 8 inch pipe |
| 03/09/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Contractor to Pac- the rebar for the catch basins they did not wet set the rebar. |
| 03/13/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Contractor formed up The catch based three on the southside and one catch basin on the northside all of them our good to pour. |
| 03/14/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
The contractor formed collars around existing storm drain and new storm drain a. Collar one on the north side one on the southside. |
| 08/16/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Ni issues at this time. |
| 09/20/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Wattle needs ‘to be removed from site prior to recall. |
| 10/24/2023 |
SITE - Stormwater Setup and Controls |
|
Passed |
|