Permit: DP22-0003

Parcel: 132131090

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP22-0003

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
03/06/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Contractor install 12 inch HDPE pipe handsome 8 inch pipe
03/09/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Contractor to Pac- the rebar for the catch basins they did not wet set the rebar.
03/13/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Contractor formed up The catch based three on the southside and one catch basin on the northside all of them our good to pour.
03/14/2023 SITE - Stormwater Setup and Controls Complete (Recurring) The contractor formed collars around existing storm drain and new storm drain a. Collar one on the north side one on the southside.
08/16/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Ni issues at this time.
09/20/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Wattle needs ‘to be removed from site prior to recall.
10/24/2023 SITE - Stormwater Setup and Controls Passed