Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP22-0003
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
01/20/2023 | ENGR Grading Final | Not Ready | Complete all work is shown on this site on the approved plans prior to calling this in for a final inspection | |
03/23/2023 | ENGR Grading Final | Not Ready | Met with a contractor to look over the modifications that have been requested for the detention retention basin or the water harvesting areas for the drop in at structures. Currently they have three of the structures already poured it around one of the structures located at the Northwest corner of the site, they have poured a 4 foot collar around the structure. This caller will need to be removed and all structures are just a drop inlet structure at South 6 inches above the finish grade for the water harvesting areas. I have advised a contractor to call in a reinspection for these areas when they are ready in the near future | |
08/16/2023 | ENGR Grading Final | Passed | ||
08/16/2023 | ENGR Grading Final | Passed | ||
08/16/2023 | ENGR Grading Final | Passed | ||
08/16/2023 | ENGR Grading Final | Passed |