Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP22-0003

Parcel: 132131090

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP22-0003

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
01/20/2023 ENGR Grading Final Not Ready Complete all work is shown on this site on the approved plans prior to calling this in for a final inspection
03/23/2023 ENGR Grading Final Not Ready Met with a contractor to look over the modifications that have been requested for the detention retention basin or the water harvesting areas for the drop in at structures. Currently they have three of the structures already poured it around one of the structures located at the Northwest corner of the site, they have poured a 4 foot collar around the structure. This caller will need to be removed and all structures are just a drop inlet structure at South 6 inches above the finish grade for the water harvesting areas. I have advised a contractor to call in a reinspection for these areas when they are ready in the near future
08/16/2023 ENGR Grading Final Passed
08/16/2023 ENGR Grading Final Passed
08/16/2023 ENGR Grading Final Passed
08/16/2023 ENGR Grading Final Passed