Permit: DP22-0003
Permit Details
Apply Date:
01/14/2022
Applicant:
David Little
Description:
Site/Grading/Swppp - QuikTrip store # 1480.
Permit Reviews
Permit Number - DP22-0003
Permit Status: Complete
Permit Description: Site/Grading/Swppp - QuikTrip store # 1480.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/14/2022 | DEV PKG - OK TO SUBMIT | 01/28/2022 | COMPLETED |
01/28/2022 | DEV PKG | 08/01/2022 | COMPLETED |
06/10/2022 | DEV PKG - RESUBMITTAL | 08/15/2022 | COMPLETED |
08/31/2022 | DEV PKG - RESUBMITTAL | 09/28/2022 | COMPLETED |
10/04/2022 | DEV PKG - RESUBMITTAL | 10/07/2022 | COMPLETED |
06/05/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/15/2023 | APPROVED |
04/07/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/24/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0003
Permite Description: Site/Grading/Swppp - QuikTrip store # 1480.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/22/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Had a pre-con with a contractor in the conversation with the contractor I am formed him that he needed to have an inspection every two weeks and the waddles Need to be staked I also gave him a detailed plan for the trash enclosures |
02/17/2023 | SITE - SWPPP Violation Notice | N/A | Not Applicable | Stormwater follow up inspection good. |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0003
Permit Description: Site/Grading/Swppp - QuikTrip store # 1480.
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/13/2023 | PDSD Site/Engineering Division - NPPO | Passed | I inspected the trash enclosure putting pour it has been completed at this time | |
01/20/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | N/A | |
08/16/2023 | SITE - Stormwater Final Inspection | Passed | ||
08/16/2023 | ENGR Grading Final | Passed | ||
08/16/2023 | SITE - SWPPP Correction Notice | Passed | ||
08/16/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
09/20/2023 | COT - ENGR - Signage Final | Passed | ||
10/24/2023 | SITE - Stormwater Setup and Controls | Passed | ||
10/24/2023 | SITE - Stormwater Follow-up | Passed | ||
10/24/2023 | ENGR Engineering Final | Passed |