Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
09/29/2021
Applicant:
Michael Scarbrough
Description:
*As Built started 3/5/24* Site/Grading - Houghton Dermatology at Houghton Town Center. New medical building.

Permit Reviews

Permit Number - DP21-0263
Permit Status: Complete
Permit Description: *As Built started 3/5/24* Site/Grading - Houghton Dermatology at Houghton Town Center. New medical building.
Start Date Submittal Complete Date Status  
01/31/2022 DEV PKG - RESUBMITTAL 04/04/2022 COMPLETED Review Details
04/07/2022 DEV PKG - RESUBMITTAL 05/25/2022 COMPLETED Review Details
09/29/2021 DEV PKG - OK TO SUBMIT 10/13/2021 COMPLETED Review Details
10/13/2021 DEV PKG 12/31/2021 COMPLETED Review Details
03/05/2024 AS-BUILT v.1 03/08/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0263
Permite Description: *As Built started 3/5/24* Site/Grading - Houghton Dermatology at Houghton Town Center. New medical building.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
01/12/2023 PDSD Engineering Division Pre-Construction SITE N/A Not Ready There is no contractor on site I spoke to the engineer of record they are going to reschedule the pre-con
04/24/2023 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns at this time
02/28/2023 SITE - Stormwater Setup and Controls N/A Complete (Recurring) Met with a contractor informed him he needs to call in inspections every two weeks. All the waddles are in place. Gave him a detailed plan of the trash enclosure per city of Tucson.
12/08/2023 PDSD Site/Engineering Division - NPPO N/A Partial Pass Landscape in progress will recall inspection next week when completed 12/13/23
12/08/2023 SITE - Stormwater Final Inspection N/A Complete (Recurring) No concerns at this time.
10/26/2023 ENGR Grading Final N/A Partial Pass met with a contractor on site and discussed about the drainage on the south west corner of the property line. I need to keep a close look at that because I don’t think it’s going to drain properly there. Contractor is good to continue to form and pour the curb and gutter and the vertical curb.
12/08/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Landscape is in progress and will be recalled for inspection on 12/13/23.

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0263
Permit Description: *As Built started 3/5/24* Site/Grading - Houghton Dermatology at Houghton Town Center. New medical building.
Total Completed Inspections - 11
Date Description Inspector Results Comments
01/13/2023 PDSD Engineering Division Pre-Construction SITE Passed Pre-con meeting was held on site with a contractor and subcontractor project is ready to go at this time for construction. The posting of the site for the switch will be done sometime early next week and a reinspection will be done at that time.
12/08/2023 SITE - SWPPP Correction Notice Passed
12/08/2023 SITE - Stormwater Follow-up Passed
12/08/2023 SITE - SWPPP Violation Notice Passed
12/08/2023 SITE - Stormwater Setup and Controls Passed
12/08/2023 COT - ENGR - Signage Final Passed
12/22/2023 PDSD Site/Engineering Division - NPPO Passed
12/22/2023 SITE - Stormwater Final Inspection Passed
01/16/2024 ENGR Grading Final Passed
01/16/2024 PDSD Site/Engineering Division - Landscaping Passed
01/16/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPROVED_DP21-0263 AS-BUILT DP_UPDATED_PDF_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED_DP21-0263 AS-BUILT DP_UPDATED_PDF_V1.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTORS LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
3_COMMENT_RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP REDLINE PAGE, 02.04.22.PDF DOCUMENTS VIEW
TEP LETTER OF APPROVAL, 02.04.22.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 02.04.22.PDF DOCUMENTS VIEW
2_COMMENT_RESPONSE LETTER.PDF DOCUMENTS VIEW
SWPPP, 02.01.22.PDF DOCUMENTS VIEW
TEP FACILITY MAP, 10.21.21.PDF DOCUMENTS VIEW
TEP REVIEW COMMENT LETTER, 10.21.21.PDF DOCUMENTS VIEW
TEP REDLINE REVIEW COMMENTS, 10.21.21.PDF DOCUMENTS VIEW
DP_APPLICATION.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL APPLICATION, RECVD 09.24.21.PDF DOCUMENTS VIEW
DRAINAGE_REPORT.PDF DOCUMENTS VIEW