Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP21-0263
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
01/12/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | There is no contractor on site I spoke to the engineer of record they are going to reschedule the pre-con | |
01/13/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-con meeting was held on site with a contractor and subcontractor project is ready to go at this time for construction. The posting of the site for the switch will be done sometime early next week and a reinspection will be done at that time. |