Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0263
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
01/05/2024 | ENGR Grading Final | Not Ready | complete all work is shown on the approved plans for this site before calling in the final grading in the future. The following items have been noted as incomplete at this time. 1) The Trash Enclosure for this site is not specified for the city details. The walls are supposed to be 66 inches above the finish floor on the inside of the trash enclosure. Currently, 5) the walls are 62 to 64 inches tall and will need to have another course of block added on top. 2) The water harvesting has not been provided as shown on the approved plans. Per the plan details water harvesting is to be 6 inches below the openings in the curbs and will need to be dug out to a deeper depth to ensure proper water harvesting quantities. 3) Complete construction at the northeast corner of the site around the backflow, preventer and ensure that all landscaping has been completed for that area. 4) Call landscape items will be verified on the next site visit for this project to ensure that all plants and trees have been installed. Accordingly that has Not been done at this time. 5) on the rear of the building adjacent too part of the electrical cabinets and switches 2 down drains from the roof drainage is depositing water directly onto the sidewalk. The main drain needs to be piped directly into the scupper directly below it, and cannot be allowed to deposit water directly onto the sidewalk. 6) Ensure that all the drainage Waze and basins have been constructed, according to the approved plans for size and dimension prior to this final inspection being scheduled. |
|
01/11/2024 | ENGR Grading Final | Partial Pass | The water harvesting basins are the only things that still need to be completed at this time | |
01/16/2024 | ENGR Grading Final | Passed | ||
08/30/2023 | ENGR Grading Final | Not Ready | ||
10/26/2023 | ENGR Grading Final | Partial Pass | met with a contractor on site and discussed about the drainage on the south west corner of the property line. I need to keep a close look at that because I don’t think it’s going to drain properly there. Contractor is good to continue to form and pour the curb and gutter and the vertical curb. | |
10/30/2023 | ENGR Grading Final | Not Ready | 1) No personal on site 2) No plans on site 3) No address posted |
|
11/01/2023 | ENGR Grading Final | Partial Pass | Contractors lane block for the trash enclosure and pouring curb in front of the building. Talk to the contractor everything’s good to go. | |
11/02/2023 | ENGR Grading Final | Partial Pass | contractor pouring for the grout at trash enclosure. I had to 4 foot Mark. | |
11/06/2023 | ENGR Grading Final | Partial Pass | contractors good to grout from the 4 foot to 6 foot beam bond is in place | |
11/27/2023 | ENGR Grading Final | Partial Pass | ||
11/27/2023 | ENGR Grading Final | Partial Pass | Contractor setting the steel for the floor for the trash enclosure good to pour. | |
11/27/2023 | ENGR Grading Final | Partial Pass | Contractor setting the steel for the floor for the trash enclosure good to pour. The walls on the trash or closures is too low. | |
11/27/2023 | ENGR Grading Final | Partial Pass | Contractor setting the steel for the floor for the trash enclosure good to pour. The walls on the trash or closures is too low. | |
12/08/2023 | ENGR Grading Final | Partial Pass | Grading for islands, medians and East front and North and South sides of building are in progress. | |
12/08/2023 | ENGR Grading Final | Partial Pass | Grading for islands, medians and East front and North and South sides of building are in progress. | |
12/08/2023 | ENGR Grading Final | Partial Pass | Grading for islands, medians and East front and North and South sides of building are in progress. | |
12/22/2023 | ENGR Grading Final | Passed | ||
12/22/2023 | ENGR Grading Final | Passed | ||
12/22/2023 | ENGR Grading Final | Passed |