Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP21-0263
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
01/13/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | I met on site with a site contractor in the dirt work contractor discuss what they are doing for this project. Preconstruction meeting was held and the contractor has been allowed to move forward with his construction. They will be posting the site with their swift information the beginning of next week and will call in another inspection so that we can approve that. | |
04/24/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
08/30/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
10/26/2023 | SITE - Stormwater Follow-up | Partial Pass | met with a contractor on site and discussed about the drainage on the south west corner of the property line. I need to keep a close look at that because I don’t think it’s going to drain properly there. Contractor is good to continue to form and pour the curb and gutter and the vertical curb. | |
11/27/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
12/08/2023 | SITE - Stormwater Follow-up | Passed |