Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
4267 N 4TH AV
Address NEW:
4267 N 4TH AV
Apply Date:
08/24/2021
Applicant:
Erin Harris
Description:
Site/Grading/Swppp - San Junipero Townhomes.

Permit Reviews

Permit Number - DP21-0216
Permit Status: Complete
Permit Description: Site/Grading/Swppp - San Junipero Townhomes.
Start Date Submittal Complete Date Status  
02/09/2022 DEV PKG - RESUBMITTAL 05/09/2022 COMPLETED Review Details
07/06/2022 DEV PKG - OK TO SUBMIT 07/22/2022 COMPLETED Review Details
07/22/2022 DEV PKG - REVISION 07/26/2022 COMPLETED Review Details
08/24/2021 DEV PKG - OK TO SUBMIT 09/01/2021 COMPLETED Review Details
09/01/2021 DEV PKG 11/19/2021 COMPLETED Review Details
07/31/2023 DEVELOPMENT PACKAGE NEW v.1 09/08/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0216
Permite Description: Site/Grading/Swppp - San Junipero Townhomes.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/26/2022 SITE - Stormwater Setup and Controls N/A Not Ready
06/22/2023 SITE - Stormwater Follow-up N/A Complete (Recurring)
11/30/2023 ENGR Grading Final N/A Partial Pass
11/21/2023 SITE - Stormwater Final Inspection N/A Partial Pass
02/15/2024 ENGR Engineering Final N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0216
Permit Description: Site/Grading/Swppp - San Junipero Townhomes.
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/04/2022 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/04/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved.
Mike with Eagle rock phone number 520 6658077
Kevin with Eagle rock 520 4819204
Dave and Michael w Meyer development and engineering. 6027691720
Project has below ground rainwater harvesting and 2 trash enclosures. Use 9185 for scheduling grading intermediate inspections. Schedule stormwater control inspection and follow up inspections biweekly. SWPPP permit required. Will be handled by Bob.}
01/26/2024 SITE - Stormwater Follow-up Passed
01/30/2024 ENGR Grading Final Passed
01/30/2024 SITE - Stormwater Final Inspection Passed
02/21/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
MASS GRADING - UTILITIES SPECIAL INSPECTION REPORTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DP21-0216 REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
REVISED SHEET 4 OF 17 FROM APPROVED DEVELOPMENT PLAN_07242023_V1.PDF DOCUMENTS VIEW
REVISION 1 STAMPED - APPROVED DEVELOPMENT PACKAGE_V1.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
CONTRACTOR'S LETTER OF INTENT.PDF DOCUMENTS VIEW
DEQ DUST PERMIT.PDF DOCUMENTS VIEW
GRADING PERMIT REQUIREMENTS, SIGNED BY APPLICANT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
COMMENT RESPONSE, 03.15.22.PDF DOCUMENTS VIEW
TITLE REPORT.PDF DOCUMENTS VIEW
PIMA CO ADDRESSING REVIEW COMMENTS, 09.27.21.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
ELEVATION SHEETS.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
SEWER CAPACITY, PIMA COUNTY.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
SWPPP BOOK.PDF DOCUMENTS VIEW