Permit: DP21-0216

Parcel: 10510059C


Addresses:

4267 N 4TH AV


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP21-0216

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/04/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Demo has been completed. Project is about to start. Native plants have been tagged for relocation. Preconstruction meeting approved.
01/12/2024 ENGR Grading Final Passed
01/30/2024 ENGR Grading Final Passed
05/25/2023 ENGR Grading Final Complete (Recurring)
07/20/2023 ENGR Grading Final Partial Pass trash enclosures north and south
09/21/2023 ENGR Grading Final Partial Pass Final grading in progress
10/06/2023 ENGR Grading Final Partial Pass preparation’s for final grade
10/10/2023 ENGR Grading Final Partial Pass Final grading in progress. Walked entire site with superintend it Michael. Provide curb openings only as specified. Basin depth is measured from overflow invert. Landscaping in progress. Terminate SWPPP and remove temporary controls for final stormwater approval. I revisions provided for perimeter fencing.
10/11/2023 ENGR Grading Final Partial Pass Paving
10/18/2023 ENGR Grading Final Partial Pass
11/02/2022 ENGR Grading Final Re-inspection required
11/09/2022 ENGR Grading Final Complete (Recurring) partially approved. 09152, 09154. Eagle rock please provide Stormwater controls along north and west side perimeters. SWPPP NOI received from Michael.
11/14/2023 ENGR Grading Final Partial Pass
11/21/2023 ENGR Grading Final Partial Pass
11/30/2023 ENGR Grading Final Partial Pass
12/01/2023 ENGR Grading Final Partial Pass Grading at South basin
12/20/2022 ENGR Grading Final Complete (Recurring) Excavation for underground basin in progress
12/20/2023 ENGR Grading Final Partial Pass Complete areas adjacent to block walls
12/22/2022 ENGR Grading Final Complete (Recurring) Partial approval. Below ground stormwater basin installation
12/29/2022 ENGR Grading Final Complete (Recurring) Below ground basin installation