Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0216
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/04/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Demo has been completed. Project is about to start. Native plants have been tagged for relocation. Preconstruction meeting approved. |
| 01/12/2024 | ENGR Grading Final | Passed | ||
| 01/30/2024 | ENGR Grading Final | Passed | ||
| 05/25/2023 | ENGR Grading Final | Complete (Recurring) | ||
| 07/20/2023 | ENGR Grading Final | Partial Pass | trash enclosures north and south | |
| 09/21/2023 | ENGR Grading Final | Partial Pass | Final grading in progress | |
| 10/06/2023 | ENGR Grading Final | Partial Pass | preparation’s for final grade | |
| 10/10/2023 | ENGR Grading Final | Partial Pass | Final grading in progress. Walked entire site with superintend it Michael. Provide curb openings only as specified. Basin depth is measured from overflow invert. Landscaping in progress. Terminate SWPPP and remove temporary controls for final stormwater approval. I revisions provided for perimeter fencing. | |
| 10/11/2023 | ENGR Grading Final | Partial Pass | Paving | |
| 10/18/2023 | ENGR Grading Final | Partial Pass | ||
| 11/02/2022 | ENGR Grading Final | Re-inspection required | ||
| 11/09/2022 | ENGR Grading Final | Complete (Recurring) | partially approved. 09152, 09154. Eagle rock please provide Stormwater controls along north and west side perimeters. SWPPP NOI received from Michael. | |
| 11/14/2023 | ENGR Grading Final | Partial Pass | ||
| 11/21/2023 | ENGR Grading Final | Partial Pass | ||
| 11/30/2023 | ENGR Grading Final | Partial Pass | ||
| 12/01/2023 | ENGR Grading Final | Partial Pass | Grading at South basin | |
| 12/20/2022 | ENGR Grading Final | Complete (Recurring) | Excavation for underground basin in progress | |
| 12/20/2023 | ENGR Grading Final | Partial Pass | Complete areas adjacent to block walls | |
| 12/22/2022 | ENGR Grading Final | Complete (Recurring) | Partial approval. Below ground stormwater basin installation | |
| 12/29/2022 | ENGR Grading Final | Complete (Recurring) | Below ground basin installation |