Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP21-0216
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by NGARCIA3 - Approved. Mike with Eagle rock phone number 520 6658077 Kevin with Eagle rock 520 4819204 Dave and Michael w Meyer development and engineering. 6027691720 Project has below ground rainwater harvesting and 2 trash enclosures. Use 9185 for scheduling grading intermediate inspections. Schedule stormwater control inspection and follow up inspections biweekly. SWPPP permit required. Will be handled by Bob. |