Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP21-0216
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
| 01/10/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 01/26/2024 | SITE - Stormwater Follow-up | Passed | ||
| 02/08/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 03/07/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | NO CONCERNS AT THIS TIME FOR THIS SITE, ONLY MINOR CONSTRUCTION NOTED DURING THIS SITE VISIT | |
| 05/09/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Michael. Walked site. Controls in place. materials contained Please remove plywood ramp at Park entrance, which is no longer being used for presents significant safety hazard at this time. |
|
| 06/22/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 07/19/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 10/11/2023 | SITE - Stormwater Follow-up | Partial Pass | No issues or concerns at this time. Final grading in progress. | |
| 11/02/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
| 11/14/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | GRADING ON SITE HAPPENING AT THIS TIME, NO CONCERNS AT THIS TIME FRO ANY STORMWATER ISSUES | |
| 11/21/2023 | SITE - Stormwater Follow-up | Partial Pass | ||
| 11/30/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | on site meeting with Michael from Meyer development and construction. stormwater controls have been installed as requested. Underground basin materials are on site and installation is about to begin. Site utility work in progress. One native mesquite tree designated to be protected in place, has been damaged in the construction process. Conversation with Michael regarding temporary water connection in public right of way. Contractor requested to have right of way inspection. |
|
| 12/14/2023 | SITE - Stormwater Follow-up | Partial Pass | no issues or concerns at this time. All materials are contained within the site. | |
| 12/19/2022 | SITE - Stormwater Follow-up | Complete (Recurring) | contractor removed the waddles along the north end of the project inform the contractor he need to Put back the waddles | |
| 12/20/2023 | SITE - Stormwater Follow-up | Partial Pass | No issues or concerns at this time. |