Permit: DP21-0216

Parcel: 10510059C


Addresses:

4267 N 4TH AV


Inspection Status: Not Ready

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP21-0216

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Follow-up Not Ready
01/10/2023 SITE - Stormwater Follow-up Complete (Recurring)
01/26/2024 SITE - Stormwater Follow-up Passed
02/08/2023 SITE - Stormwater Follow-up Complete (Recurring)
03/07/2023 SITE - Stormwater Follow-up Complete (Recurring) NO CONCERNS AT THIS TIME FOR THIS SITE, ONLY MINOR CONSTRUCTION NOTED DURING THIS SITE VISIT
05/09/2023 SITE - Stormwater Follow-up Complete (Recurring) Michael. Walked site. Controls in place. materials contained
Please remove plywood ramp at Park entrance, which is no longer being used for presents significant safety hazard at this time.
06/22/2023 SITE - Stormwater Follow-up Complete (Recurring)
07/19/2023 SITE - Stormwater Follow-up Complete (Recurring)
10/11/2023 SITE - Stormwater Follow-up Partial Pass No issues or concerns at this time. Final grading in progress.
11/02/2022 SITE - Stormwater Follow-up Re-inspection required
11/14/2022 SITE - Stormwater Follow-up Complete (Recurring) GRADING ON SITE HAPPENING AT THIS TIME, NO CONCERNS AT THIS TIME FRO ANY STORMWATER ISSUES
11/21/2023 SITE - Stormwater Follow-up Partial Pass
11/30/2022 SITE - Stormwater Follow-up Complete (Recurring) on site meeting with Michael from Meyer development and construction. stormwater controls have been installed as requested. Underground basin materials are on site and installation is about to begin. Site utility work in progress. One native mesquite tree designated to be protected in place, has been damaged in the construction process.
Conversation with Michael regarding temporary water connection in public right of way. Contractor requested to have right of way inspection.
12/14/2023 SITE - Stormwater Follow-up Partial Pass no issues or concerns at this time. All materials are contained within the site.
12/19/2022 SITE - Stormwater Follow-up Complete (Recurring) contractor removed the waddles along the north end of the project inform the contractor he need to Put back the waddles
12/20/2023 SITE - Stormwater Follow-up Partial Pass No issues or concerns at this time.