Permit: DP21-0173
Permit Details
Apply Date:
07/01/2021
Applicant:
Kaye Bagley
Description:
Site/Grading/Swppp - Foothills RV and Storage.
Permit Reviews
Permit Number - DP21-0173
Permit Status: Complete
Permit Description: Site/Grading/Swppp - Foothills RV and Storage.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/01/2021 | DEV PKG - OK TO SUBMIT | 07/09/2021 | COMPLETED |
07/09/2021 | DEV PKG | 09/01/2021 | COMPLETED |
10/18/2021 | DEV PKG - RESUBMITTAL | 11/30/2021 | COMPLETED |
12/17/2021 | DEV PKG - RESUBMITTAL | 01/14/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0173
Permite Description: Site/Grading/Swppp - Foothills RV and Storage.
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/07/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 09/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Provide controls as needed. } |
06/28/2023 | SITE - SWPPP Violation Notice | N/A | Not Applicable | |
07/28/2023 | SITE - SWPPP Correction Notice | N/A | Not Ready | this is Stormwater follow up inspection. Track out noted on Fort Lowell Road. |
08/15/2023 | PDSD Site/Engineering Division - NPPO | N/A | Partial Pass | |
09/30/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 09/30/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out noted after last rain event.} ; {Activity date: 09/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continue. No issues or concerns. Clean up any off site discharge as needed. } |
08/15/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Rough grading |
08/21/2023 | ENGR Grading Final | N/A | Not Ready | Contractor call for a grout on an exterior wall. This inspection is not ready at this time because it is not an inspection that we will do. I have advised him to get a hold of his building inspector, and they are the ones that will perform this inspection for him. |
12/11/2023 | COT - ENGR - Signage Final | N/A | Not Ready | |
03/15/2024 | ENGR Engineering Final | N/A | Partial Pass | engineering has no issues that would prevent a level 4 TCO for the basement through level three. |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0173
Permit Description: Site/Grading/Swppp - Foothills RV and Storage.
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/07/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved. Bob Miller at520-993-6437. TLW construction. Steve and Chuck. Plan engineer on site also City of Tucson right away Inspector. Comply with all construction documents, provide revisions for any changes. Call for biweekly Stormwater follow up inspections. Schedule Stormwater control inspections when ready. Install SWPPP signage and stormwater protections as needed. Call for grading intermediate inspections for trash enclosure, accessible walkways, and water harvesting. No underground storm water piping on this project.} |
|
07/06/2023 | SITE - Stormwater Final Inspection | Passed | ||
12/11/2023 | SITE - SWPPP Correction Notice | Passed | ||
01/11/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
02/05/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
02/05/2024 | ENGR Grading Final | Passed | ||
03/15/2024 | COT - ENGR - Signage Final | Passed | ||
03/19/2024 | ENGR Engineering Final | Passed |