Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0173
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
01/11/2024 | ENGR Engineering Final | Not Ready | ||
01/25/2024 | ENGR Engineering Final | Passed | Observed drywall on the east central portion of property. Plans did not discuss drywell. Requested drywell ADEQ registration and engineering boring logs as part of DP final closure package. | |
07/19/2023 | ENGR Engineering Final | Partial Pass | engineering has no issues that would prevent a level 4 TCO for the basement through level three. | |
03/19/2024 | ENGR Engineering Final | Passed |