Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP21-0173

Parcel: 11006012C

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP21-0173

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
09/07/2022 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by VVERA1 - Approved. Bob Miller at520-993-6437. TLW construction. Steve and Chuck. Plan engineer on site also City of Tucson right away Inspector. Comply with all construction documents, provide revisions for any changes. Call for biweekly Stormwater follow up inspections. Schedule Stormwater control inspections when ready. Install SWPPP signage and stormwater protections as needed. Call for grading intermediate inspections for trash enclosure, accessible walkways, and water harvesting. No underground storm water piping on this project.