| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 08/31/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Preconstruction meeting scheduled for next Wednesday at 1 PM with Bob Miller at 993-6437. |
| 09/07/2022 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - . Not ready. Schedule inspections for trash enclosure footings and block wall. Number four bar 32 inch on center required. |
| 10/11/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Grading and over excavation in progress. Large material piles on site |
| 09/30/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued, Grading and material hauling. |
| 01/11/2024 |
ENGR Grading Final |
|
Not Ready |
|
| 01/25/2024 |
ENGR Grading Final |
|
Not Ready |
Observed drywall on the east central portion of property. Plans did not discuss drywell. Requested drywell ADEQ registration and engineering boring logs as part of DP final closure package. |
| 02/05/2024 |
ENGR Grading Final |
|
Passed |
|
| 02/22/2023 |
ENGR Grading Final |
|
Partial Pass |
Eddie Avila 993-6437 |
| 05/23/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
site has been rough graded. large material piles stored at rear of site. trackout protections in place |
| 06/27/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
Building construction in progress. Site has been rough graded at this time. |
| 07/13/2023 |
ENGR Grading Final |
|
Partial Pass |
|
| 07/27/2023 |
ENGR Grading Final |
|
Partial Pass |
pavement and shade canopy installation south of building in progress. Magnum, on-site, forming curbs, islands, and installing the north basin. |
| 08/15/2023 |
ENGR Grading Final |
|
Partial Pass |
trash enclosure footing, and bollards |
| 08/21/2023 |
ENGR Grading Final |
|
Not Ready |
Contractor call for a grout on an exterior wall. This inspection is not ready at this time because it is not an inspection that we will do. I have advised him to get a hold of his building inspector, and they are the ones that will perform this inspection for him. |
| 11/16/2023 |
ENGR Grading Final |
|
Partial Pass |
rebar installed today, pix will be sent later today |
| 11/27/2023 |
ENGR Grading Final |
|
Partial Pass |
site cleanup needed and stormwater basin incomplete both on north side |
| 12/08/2023 |
ENGR Grading Final |
|
Partial Pass |
Trout noted on Fort Lowell Road. |
| 12/11/2023 |
ENGR Grading Final |
|
Passed |
needs cleaning of solid waste |