Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0173
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
08/31/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Preconstruction meeting scheduled for next Wednesday at 1 PM with Bob Miller at 993-6437. |
09/07/2022 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - . Not ready. Schedule inspections for trash enclosure footings and block wall. Number four bar 32 inch on center required. |
10/11/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Grading and over excavation in progress. Large material piles on site |
09/30/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued, Grading and material hauling. |
01/11/2024 | ENGR Grading Final | Not Ready | ||
01/25/2024 | ENGR Grading Final | Not Ready | Observed drywall on the east central portion of property. Plans did not discuss drywell. Requested drywell ADEQ registration and engineering boring logs as part of DP final closure package. | |
02/05/2024 | ENGR Grading Final | Passed | ||
02/22/2023 | ENGR Grading Final | Partial Pass | Eddie Avila 993-6437 | |
05/23/2023 | ENGR Grading Final | Complete (Recurring) | site has been rough graded. large material piles stored at rear of site. trackout protections in place | |
06/27/2023 | ENGR Grading Final | Complete (Recurring) | Building construction in progress. Site has been rough graded at this time. | |
07/13/2023 | ENGR Grading Final | Partial Pass | ||
07/27/2023 | ENGR Grading Final | Partial Pass | pavement and shade canopy installation south of building in progress. Magnum, on-site, forming curbs, islands, and installing the north basin. | |
08/15/2023 | ENGR Grading Final | Partial Pass | trash enclosure footing, and bollards | |
08/21/2023 | ENGR Grading Final | Not Ready | Contractor call for a grout on an exterior wall. This inspection is not ready at this time because it is not an inspection that we will do. I have advised him to get a hold of his building inspector, and they are the ones that will perform this inspection for him. | |
11/16/2023 | ENGR Grading Final | Partial Pass | rebar installed today, pix will be sent later today | |
11/27/2023 | ENGR Grading Final | Partial Pass | site cleanup needed and stormwater basin incomplete both on north side | |
12/08/2023 | ENGR Grading Final | Partial Pass | Trout noted on Fort Lowell Road. | |
12/11/2023 | ENGR Grading Final | Passed | needs cleaning of solid waste |