Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
7960 E BROADWAY BL
Apply Date:
06/28/2021
Applicant:
Andrea Krug
Description:
Site/Grading/SWPPP - Take 5 Oil Change facility.

Permit Reviews

Permit Number - DP21-0170
Permit Status: Complete
Permit Description: Site/Grading/SWPPP - Take 5 Oil Change facility.
Start Date Submittal Complete Date Status  
06/28/2021 DEV PKG - OK TO SUBMIT 07/02/2021 COMPLETED Review Details
07/02/2021 DEV PKG 08/05/2021 COMPLETED Review Details
10/05/2021 DEV PKG - RESUBMITTAL 11/12/2021 COMPLETED Review Details
12/14/2021 DEV PKG - RESUBMITTAL 01/26/2022 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0170
Permite Description: Site/Grading/SWPPP - Take 5 Oil Change facility.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/22/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 09/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN. NO CONCERNS AS OF TODAY
7970 E BROADWAY BL} ; {Activity date: 09/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN. NO CONCERNS AS OF TODAY
7960 E BROADWAY BL} ; {Activity date: 09/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ NO CHANGES AT IS TIME .}

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0170
Permit Description: Site/Grading/SWPPP - Take 5 Oil Change facility.
Total Completed Inspections - 10
Date Description Inspector Results Comments
01/31/2023 PDSD Site/Engineering Division - Landscaping Passed
01/31/2023 SITE - SWPPP Correction Notice Passed
01/31/2023 PDSD Site/Engineering Division - NPPO Passed
01/31/2023 ENGR Engineering Final Passed
01/31/2023 ENGR Grading Final Passed
01/31/2023 SITE - SWPPP Violation Notice Passed
01/31/2023 SITE - Stormwater Final Inspection Passed
01/31/2023 SITE - Stormwater Setup and Controls Passed
01/31/2023 PDSD Engineering Division Pre-Construction SITE Passed
01/31/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER OF INTENT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
NEW DRAFT DECLARATION OF ACCESS AND OTHER EASEMENTS.PDF DOCUMENTS VIEW
DRAFT AMENDMENT TO REA, RECIPROCAL EASEMENT AGREEMENT.PDF DOCUMENTS VIEW
RECORDED RECIPROCAL EASEMENT AGREEMENT, YEAR 2015.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 12.13.21.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR 10.5.21.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 10.01.21.PDF DOCUMENTS VIEW
ZE APPROVAL LTR 9-30-21, ZONING EXAMINER, JOHN IURINO.PDF DOCUMENTS VIEW
DEV PKG APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE RPT.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL APPLICATION, RECVD 06.25.21.PDF DOCUMENTS VIEW
TERRACON GEOTECH REPORT.PDF DOCUMENTS VIEW
TITLE REPORT.PDF DOCUMENTS VIEW
WATER AVAILABILITY LTR, TUCSON WATER, 6-8-21.PDF DOCUMENTS VIEW