Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP21-0163
Permit Details
Apply Date:
06/23/2021
Applicant:
Erin Harris
Description:
Grading/ Swppp - Limberlost Estates, Lots 1 through 10 and common areas.
Permit Reviews
Permit Number - DP21-0163
Permit Status: In review
Permit Description: Grading/ Swppp - Limberlost Estates, Lots 1 through 10 and common areas.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/23/2021 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 07/01/2021 | COMPLETED |
07/01/2021 | GRADING | 08/30/2021 | COMPLETED |
06/27/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 07/18/2023 | REQUIRES RESUBMIT |
08/21/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/20/2023 | APPROVED |
Outstanding Inspections
Permit Status: In Review
Permit Number: DP21-0163
Permite Description: Grading/ Swppp - Limberlost Estates, Lots 1 through 10 and common areas.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2024 | ENGR Grading Final | N/A | Partial Pass | |
05/03/2024 | COT - ENGR - Stormwater | N/A | Partial Pass | |
05/30/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | |
05/30/2024 | ENGR - Drainage Structures | N/A | Not Applicable | |
05/29/2024 | SITE - Stormwater Follow-up | N/A | Partial Pass | |
11/05/2024 | SITE - Stormwater Final Inspection | N/A | Partial Pass | Contractors got finished with the basins yet |
Completed Inspections
Permit Status: In Review
Permit Number: DP21-0163
Permit Description: Grading/ Swppp - Limberlost Estates, Lots 1 through 10 and common areas.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2024 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | Passed | ||
04/25/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | superintendent Lance at 975-2730, Bryan with desert earth excavating. 10 unit subdivision with 10 parking spaces, a trash enclosure and a large basin. None of the native trees are shown to remain. Post address. Schedule regular swppp inspections. Provide controls at Northwest basin opening into grocery store parking lot. Schedule inspection prior to landscaping. |
|
05/29/2024 | SITE - Stormwater Setup and Controls | Passed | ||
05/29/2024 | NPPO Pre-Construction | Passed | ||
09/03/2024 | SITE - Stormwater Follow-up | Passed |